A hybrid stochastic/deterministic unit commitment based on projected disjunctive MILP reformulation
This letter presents a new expression of the chance constraint, representing ramping and operating reserve, in the context of the mixed integer linear programming (MILP) formulation for solving the hybrid stochastic/deterministic unit commitment (SDUC) problem. Based on projected disjunctive program...
Saved in:
Main Authors: | Tan, W. S., Shaaban, M. |
---|---|
Format: | Article |
Published: |
Institute of Electrical and Electronics Engineers Inc.
2016
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/71942/ https://www.scopus.com/inward/record.uri?eid=2-s2.0-84957635312&doi=10.1109%2fTPWRS.2016.2521326&partnerID=40&md5=116e8dcce20c7589e4613d96b3001ef2 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
A multi-timescale hybrid stochastic/deterministic generation scheduling framework with flexiramp and cycliramp costs
by: Shaaban, Mohamed, et al.
Published: (2018) -
A multi-timescale hybrid stochastic/deterministic generation scheduling framework with flexiramp and cycliramp costs
by: Mohamed, Shaaban, et al.
Published: (2018) -
Deterministic And Stochastic Simulations Of Infectious Diseases
by: Tan, Wai Kiat
Published: (2013) -
A review of deterministic anti collision algorithm of passive RFID systems
by: Yaacob, Marizan, et al.
Published: (2019) -
Evaluation of Deterministic Routing on 100-cores Mesh Wireless NoC
by: Asrani, Lit, et al.
Published: (2023)