A proposed model to enhance crisis management capabilities of electricity production and supply companies in Pakistan

Crisis management (CM) is considered to be of growing importance in the management of utilities. A wealth of literature on crisis stresses on the need to enhance crisis management capabilities such as decision making, and leadership. Such capabilities are already in practice in the developed countri...

Full description

Saved in:
Bibliographic Details
Main Authors: Haider, Maqsood, Md. Rasli, Mohd. Amran
Format: Article
Language:English
Published: Penerbit UTM Press 2015
Subjects:
Online Access:http://eprints.utm.my/id/eprint/55856/1/MaqsoodHaider2015_AProposedModeltoEnhanceCrisisManagement.pdf
http://eprints.utm.my/id/eprint/55856/
http://dx.doi.org/10.11113/jt.v72.3945
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utm.55856
record_format eprints
spelling my.utm.558562017-11-01T04:17:00Z http://eprints.utm.my/id/eprint/55856/ A proposed model to enhance crisis management capabilities of electricity production and supply companies in Pakistan Haider, Maqsood Md. Rasli, Mohd. Amran H Social Sciences (General) Crisis management (CM) is considered to be of growing importance in the management of utilities. A wealth of literature on crisis stresses on the need to enhance crisis management capabilities such as decision making, and leadership. Such capabilities are already in practice in the developed countries but have been mostly ignored in developing countries like Pakistan. Because of the neglect of the crisis management capabilities particularly in relation to utilities, Pakistan is facing acute shortage of electricity which is the life and blood of the industrial development in the country. Due to the electricity crisis, many of the industries have been forced to shut down and hundreds of thousands have become unemployed. The present study is an attempt to propose a framework that would help enhance the crisis management capabilities of the companies involved in electricity production and supply. A comprehensive review of literature has been carried out in order to propose a conceptual framework accordingly. Penerbit UTM Press 2015 Article PeerReviewed application/pdf en http://eprints.utm.my/id/eprint/55856/1/MaqsoodHaider2015_AProposedModeltoEnhanceCrisisManagement.pdf Haider, Maqsood and Md. Rasli, Mohd. Amran (2015) A proposed model to enhance crisis management capabilities of electricity production and supply companies in Pakistan. Jurnal Teknologi, 72 (5). pp. 83-88. ISSN 0127-9696 http://dx.doi.org/10.11113/jt.v72.3945 DOI:10.11113/jt.v72.3945
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
language English
topic H Social Sciences (General)
spellingShingle H Social Sciences (General)
Haider, Maqsood
Md. Rasli, Mohd. Amran
A proposed model to enhance crisis management capabilities of electricity production and supply companies in Pakistan
description Crisis management (CM) is considered to be of growing importance in the management of utilities. A wealth of literature on crisis stresses on the need to enhance crisis management capabilities such as decision making, and leadership. Such capabilities are already in practice in the developed countries but have been mostly ignored in developing countries like Pakistan. Because of the neglect of the crisis management capabilities particularly in relation to utilities, Pakistan is facing acute shortage of electricity which is the life and blood of the industrial development in the country. Due to the electricity crisis, many of the industries have been forced to shut down and hundreds of thousands have become unemployed. The present study is an attempt to propose a framework that would help enhance the crisis management capabilities of the companies involved in electricity production and supply. A comprehensive review of literature has been carried out in order to propose a conceptual framework accordingly.
format Article
author Haider, Maqsood
Md. Rasli, Mohd. Amran
author_facet Haider, Maqsood
Md. Rasli, Mohd. Amran
author_sort Haider, Maqsood
title A proposed model to enhance crisis management capabilities of electricity production and supply companies in Pakistan
title_short A proposed model to enhance crisis management capabilities of electricity production and supply companies in Pakistan
title_full A proposed model to enhance crisis management capabilities of electricity production and supply companies in Pakistan
title_fullStr A proposed model to enhance crisis management capabilities of electricity production and supply companies in Pakistan
title_full_unstemmed A proposed model to enhance crisis management capabilities of electricity production and supply companies in Pakistan
title_sort proposed model to enhance crisis management capabilities of electricity production and supply companies in pakistan
publisher Penerbit UTM Press
publishDate 2015
url http://eprints.utm.my/id/eprint/55856/1/MaqsoodHaider2015_AProposedModeltoEnhanceCrisisManagement.pdf
http://eprints.utm.my/id/eprint/55856/
http://dx.doi.org/10.11113/jt.v72.3945
_version_ 1643653921808318464
score 13.211869