Impact of unplanned schedule compression on project cost
The implementation of unplanned schedule compression is common in the construction environment. When necessary, contractors would need to select methods that also minimize the cost impact on the project. Unfortunately, a limited knowledge exists for determining the methods to be employed in mitigati...
Saved in:
Main Authors: | Mansur, Shaiful Amri, Mohamad Zin, Rosli, Sea, E. N. |
---|---|
Format: | Conference or Workshop Item |
Language: | English |
Published: |
2006
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/541/1/SAMansur2006_Impactofunplannedschedulecompression.pdf http://eprints.utm.my/id/eprint/541/ http://civil.utm.my/apsec2015/about-apsec/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Guidelines for the preparation and submission of work schedule for construction project
by: Mohamad Zin, Rosli, et al.
Published: (2008) -
Information management to integrate cost and schedule for infrastructure projects
by: Chung , Keat Wei
Published: (2004) -
Impact of the cost overrun factors on the project delays in construction industry
by: Noor Elinah, Sailin
Published: (2018) -
Failure costs and cost predictability in construction projects
by: Low, Sook May, et al.
Published: (2013) -
Impact of cost overrun factors on the project delay in construction industry, Pahang, Malaysia
by: Zhi Jia, Ling
Published: (2014)