Soil improvement for taxiway and apron due to soft ground problem

Soft ground created a lot of problems to the structure or pavement. The safety of the aircraft movements through taxiway and parking the aircraft on parking apron is subjected to standard as required by International Civil Aviation Organization (ICAO). Thus, soft soil affected the performance of the...

Full description

Saved in:
Bibliographic Details
Main Author: Abdullah, Ilias
Format: Thesis
Language:English
Published: 2015
Subjects:
Online Access:http://eprints.utm.my/id/eprint/53801/1/IliasAbdullahMFKA2015.pdf
http://eprints.utm.my/id/eprint/53801/
http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:86711
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utm.53801
record_format eprints
spelling my.utm.538012020-09-02T09:10:43Z http://eprints.utm.my/id/eprint/53801/ Soil improvement for taxiway and apron due to soft ground problem Abdullah, Ilias TA Engineering (General). Civil engineering (General) Soft ground created a lot of problems to the structure or pavement. The safety of the aircraft movements through taxiway and parking the aircraft on parking apron is subjected to standard as required by International Civil Aviation Organization (ICAO). Thus, soft soil affected the performance of the pavement by creating defects such as rutting, crack and settlement which might result foreign object damage (FOD) to the aircraft engine. This paper analysed the recommendation soil improvement method, compared the magnitude of settlement from site investigation data using manual simulating and validated the settlement using SIGMA/W software for accuracy. In this study, it was limited to the aircraft loadings of A330 on taxiway and the aircraft loadings of A320 on dispersal area/apron pavement based on Miri Airport condition. This study indicated that the differences displacement from site measurement calculation simulation and the software simulation about 15% for taxiway and 25 % for dispersal area/apron pavement. 2015-06 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/id/eprint/53801/1/IliasAbdullahMFKA2015.pdf Abdullah, Ilias (2015) Soil improvement for taxiway and apron due to soft ground problem. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:86711
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
language English
topic TA Engineering (General). Civil engineering (General)
spellingShingle TA Engineering (General). Civil engineering (General)
Abdullah, Ilias
Soil improvement for taxiway and apron due to soft ground problem
description Soft ground created a lot of problems to the structure or pavement. The safety of the aircraft movements through taxiway and parking the aircraft on parking apron is subjected to standard as required by International Civil Aviation Organization (ICAO). Thus, soft soil affected the performance of the pavement by creating defects such as rutting, crack and settlement which might result foreign object damage (FOD) to the aircraft engine. This paper analysed the recommendation soil improvement method, compared the magnitude of settlement from site investigation data using manual simulating and validated the settlement using SIGMA/W software for accuracy. In this study, it was limited to the aircraft loadings of A330 on taxiway and the aircraft loadings of A320 on dispersal area/apron pavement based on Miri Airport condition. This study indicated that the differences displacement from site measurement calculation simulation and the software simulation about 15% for taxiway and 25 % for dispersal area/apron pavement.
format Thesis
author Abdullah, Ilias
author_facet Abdullah, Ilias
author_sort Abdullah, Ilias
title Soil improvement for taxiway and apron due to soft ground problem
title_short Soil improvement for taxiway and apron due to soft ground problem
title_full Soil improvement for taxiway and apron due to soft ground problem
title_fullStr Soil improvement for taxiway and apron due to soft ground problem
title_full_unstemmed Soil improvement for taxiway and apron due to soft ground problem
title_sort soil improvement for taxiway and apron due to soft ground problem
publishDate 2015
url http://eprints.utm.my/id/eprint/53801/1/IliasAbdullahMFKA2015.pdf
http://eprints.utm.my/id/eprint/53801/
http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:86711
_version_ 1677781098216554496
score 13.211869