Faktor dan piawaian dalam penyediaan laporan kajian kemungkinan
The needs of feasibility study report is important in the new era of development. Problem from the ineffective feasibility study has resulted the financing process faced difficulty to be approved. The developer could hardly fulfilled the standards for the financing approval. This happens because the...
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2015
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/53655/25/MohamadAliffZaquanMohamadHishamMFGHT2015.pdf http://eprints.utm.my/id/eprint/53655/ http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:84638 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.utm.53655 |
---|---|
record_format |
eprints |
spelling |
my.utm.536552020-09-01T00:50:25Z http://eprints.utm.my/id/eprint/53655/ Faktor dan piawaian dalam penyediaan laporan kajian kemungkinan Mohamad Hisham, Mohamad Aliff Zaquan HD1394-1394.5 Real estate management The needs of feasibility study report is important in the new era of development. Problem from the ineffective feasibility study has resulted the financing process faced difficulty to be approved. The developer could hardly fulfilled the standards for the financing approval. This happens because there is no guideline for the feasibility study report to facilitate the approval of the bank. The developer also failed to take into account the important element in the feasibility study report. This study focus on the bank which financing the development and the evaluation from registered valuer. The valuers who are responsible for preparing for the feasibility study report to the developer and the bank. The purpose of this study is to identify the main requirements to produce a comprehensive feasibility study report. In addition, the contents of the existing research reports prepared by the developer do not meet the needs of construction projects that are competent. The main agenda of this research is to analyse the factors that had been emphasized and the standard of the feasibility study report. Next, is to identify the element of feasibility study report that is comprehensive toward the approval of development financing. A case study is chosen in Johor Bahru, Johor. The premier data is collected from interviews with the respondent of bank and valuers, secondary data collected through reports and guidelines. Sixteen respondents consist of ten bank and six valuer selected for this research. Therefore, the results using qualitative methods are presented in tables, diagrams, pie charts, descriptions and explanations. The result that achieved are the main objective to identify the feasibility study factor made according to it priority, the party responsible to assess the feasibility study, the regulation involved with the approval of feasibility study report, priority factor of the approval of development financing, factor of the valuation toward the feasibility study report, the weaknesses in the feasibility study report, and the standards in the feasibility study report. Then, the standard operational procedure of bank approval, critical success factors, failure factors in the feasibility study report and resolve problems in the feasibility study report. The contribution of the knowledge in this study are to improved the current concept of feasibility study and to reform old-dimensional measurement of development loan approval. Therefore, it contribute toward the best practice of bankers and developers profession. Lastly, the need of feasibility study are the basic requirement to secure the approval of the development financing to the developer from the banker. 2015-03 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/id/eprint/53655/25/MohamadAliffZaquanMohamadHishamMFGHT2015.pdf Mohamad Hisham, Mohamad Aliff Zaquan (2015) Faktor dan piawaian dalam penyediaan laporan kajian kemungkinan. Masters thesis, Universiti Teknologi Malaysia, Faculty of Geoinformation and Real Estate. http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:84638 |
institution |
Universiti Teknologi Malaysia |
building |
UTM Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Malaysia |
content_source |
UTM Institutional Repository |
url_provider |
http://eprints.utm.my/ |
language |
English |
topic |
HD1394-1394.5 Real estate management |
spellingShingle |
HD1394-1394.5 Real estate management Mohamad Hisham, Mohamad Aliff Zaquan Faktor dan piawaian dalam penyediaan laporan kajian kemungkinan |
description |
The needs of feasibility study report is important in the new era of development. Problem from the ineffective feasibility study has resulted the financing process faced difficulty to be approved. The developer could hardly fulfilled the standards for the financing approval. This happens because there is no guideline for the feasibility study report to facilitate the approval of the bank. The developer also failed to take into account the important element in the feasibility study report. This study focus on the bank which financing the development and the evaluation from registered valuer. The valuers who are responsible for preparing for the feasibility study report to the developer and the bank. The purpose of this study is to identify the main requirements to produce a comprehensive feasibility study report. In addition, the contents of the existing research reports prepared by the developer do not meet the needs of construction projects that are competent. The main agenda of this research is to analyse the factors that had been emphasized and the standard of the feasibility study report. Next, is to identify the element of feasibility study report that is comprehensive toward the approval of development financing. A case study is chosen in Johor Bahru, Johor. The premier data is collected from interviews with the respondent of bank and valuers, secondary data collected through reports and guidelines. Sixteen respondents consist of ten bank and six valuer selected for this research. Therefore, the results using qualitative methods are presented in tables, diagrams, pie charts, descriptions and explanations. The result that achieved are the main objective to identify the feasibility study factor made according to it priority, the party responsible to assess the feasibility study, the regulation involved with the approval of feasibility study report, priority factor of the approval of development financing, factor of the valuation toward the feasibility study report, the weaknesses in the feasibility study report, and the standards in the feasibility study report. Then, the standard operational procedure of bank approval, critical success factors, failure factors in the feasibility study report and resolve problems in the feasibility study report. The contribution of the knowledge in this study are to improved the current concept of feasibility study and to reform old-dimensional measurement of development loan approval. Therefore, it contribute toward the best practice of bankers and developers profession. Lastly, the need of feasibility study are the basic requirement to secure the approval of the development financing to the developer from the banker. |
format |
Thesis |
author |
Mohamad Hisham, Mohamad Aliff Zaquan |
author_facet |
Mohamad Hisham, Mohamad Aliff Zaquan |
author_sort |
Mohamad Hisham, Mohamad Aliff Zaquan |
title |
Faktor dan piawaian dalam penyediaan laporan kajian kemungkinan |
title_short |
Faktor dan piawaian dalam penyediaan laporan kajian kemungkinan |
title_full |
Faktor dan piawaian dalam penyediaan laporan kajian kemungkinan |
title_fullStr |
Faktor dan piawaian dalam penyediaan laporan kajian kemungkinan |
title_full_unstemmed |
Faktor dan piawaian dalam penyediaan laporan kajian kemungkinan |
title_sort |
faktor dan piawaian dalam penyediaan laporan kajian kemungkinan |
publishDate |
2015 |
url |
http://eprints.utm.my/id/eprint/53655/25/MohamadAliffZaquanMohamadHishamMFGHT2015.pdf http://eprints.utm.my/id/eprint/53655/ http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:84638 |
_version_ |
1677781083182071808 |
score |
13.211869 |