Method of assessing concurrent delays
Construction delay claims are inevitable in most projects in the construction industry. It is rarely seen that a project completed without any adjustment on the completion time. Concurrent delay claims are the most disputed issue in the industry mainly because there is no uniform definition and lack...
Saved in:
Main Author: | Abdullah, Ar Samsiah |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2014
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/48832/25/ArSamsiahAbdullahMFAB2014.pdf http://eprints.utm.my/id/eprint/48832/ http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:83671 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
The analysis of factors contributed to delay and method to analyze the delay in construction project
by: Mohammad Solhi, Mohammed
Published: (2010) -
A study on the causes and methods to prevent construction delay in Selangor state and Kuala Lumpur
by: Yap, Qing Fu
Published: (2013) -
Nature of delay in nominated subcontracting
by: Nasid Masrom, Md. Asrul
Published: (2007) -
The profile of construction delay cases
by: Loo, Jenny Shih Yein
Published: (2012) -
The issues of delay in construction project
by: Seng, Hock Sing, et al.
Published: (2013)