Productivity Assessment and Schedule Compression Index (PASCI) for project planning
Planning and scheduling of construction projects are very much affected by its resource productivity and influenced by various other factors. An increase in construction time and cost is usually related to inefficiency or low productivity, which can be reduced by employing effective planning and mon...
Saved in:
Main Authors: | , , |
---|---|
Format: | Conference or Workshop Item |
Language: | English |
Published: |
2003
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/471/1/1A_8._Shaiful_Amri_Productivity_Assessment_PAGE_%28133-147%29.pdf http://eprints.utm.my/id/eprint/471/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.utm.471 |
---|---|
record_format |
eprints |
spelling |
my.utm.4712017-08-30T08:28:37Z http://eprints.utm.my/id/eprint/471/ Productivity Assessment and Schedule Compression Index (PASCI) for project planning Mansur, Shaiful Amri Che Wan Putra, C. W. F. Mohamed, A. H. TA Engineering (General). Civil engineering (General) Planning and scheduling of construction projects are very much affected by its resource productivity and influenced by various other factors. An increase in construction time and cost is usually related to inefficiency or low productivity, which can be reduced by employing effective planning and monitoring. Schedule compression or work acceleration whether it is planned or unplanned, is normally required to recover projects from delay and inefficient works. It is not easy to perform schedule compression for people who do not have good knowledge and experience on construction processes. The situation can become very difficult and discouraging for many small contractors, especially during economic downturns. There is a need for a simple way to assess productivity and apply schedule compression by using simplified tools such as an index. This paper discusses an on-going research, which objective is to produce a project assessment tool called the Productivity Assessment and Schedule Compression Index (PASCI). This index utilizes a combination of weighted scores from key elements that affect labour productivity and schedule compression methods. It predicts the capability of completing a construction project by comparing the index score to its given contract period at a certain stage of a project. Using the index as a guide, further actions can be taken by contractors and clients, which could produce savings in terms of time and cost. 2003-08-26 Conference or Workshop Item PeerReviewed application/pdf en http://eprints.utm.my/id/eprint/471/1/1A_8._Shaiful_Amri_Productivity_Assessment_PAGE_%28133-147%29.pdf Mansur, Shaiful Amri and Che Wan Putra, C. W. F. and Mohamed, A. H. (2003) Productivity Assessment and Schedule Compression Index (PASCI) for project planning. In: Proceedings of the 5th Asia-Pacific Structural Engineering and Construction Conference , 26-28 August 2003, Johor Bahru, Johor, Malaysia. |
institution |
Universiti Teknologi Malaysia |
building |
UTM Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Malaysia |
content_source |
UTM Institutional Repository |
url_provider |
http://eprints.utm.my/ |
language |
English |
topic |
TA Engineering (General). Civil engineering (General) |
spellingShingle |
TA Engineering (General). Civil engineering (General) Mansur, Shaiful Amri Che Wan Putra, C. W. F. Mohamed, A. H. Productivity Assessment and Schedule Compression Index (PASCI) for project planning |
description |
Planning and scheduling of construction projects are very much affected by its resource productivity and influenced by various other factors. An increase in construction time and cost is usually related to inefficiency or low productivity, which can be reduced by employing effective planning and monitoring. Schedule compression or work acceleration whether it is planned or unplanned, is normally required to recover projects from delay and inefficient works. It is not easy to perform schedule compression for people who do not have good knowledge and experience on construction processes. The situation can become very difficult and discouraging for many small contractors, especially during economic downturns. There is a need for a simple way to assess productivity and apply schedule compression by using simplified tools such as an index. This paper discusses an on-going research, which objective is to produce a project assessment tool called the Productivity Assessment and Schedule Compression Index (PASCI). This index utilizes a combination of weighted scores from key elements that affect labour productivity and schedule compression methods. It predicts the capability of completing a construction project by comparing the index score to its given contract period at a certain stage of a project. Using the index as a guide, further actions can be taken by contractors and clients, which could produce savings in terms of time and cost. |
format |
Conference or Workshop Item |
author |
Mansur, Shaiful Amri Che Wan Putra, C. W. F. Mohamed, A. H. |
author_facet |
Mansur, Shaiful Amri Che Wan Putra, C. W. F. Mohamed, A. H. |
author_sort |
Mansur, Shaiful Amri |
title |
Productivity Assessment and Schedule Compression Index (PASCI) for project planning |
title_short |
Productivity Assessment and Schedule Compression Index (PASCI) for project planning |
title_full |
Productivity Assessment and Schedule Compression Index (PASCI) for project planning |
title_fullStr |
Productivity Assessment and Schedule Compression Index (PASCI) for project planning |
title_full_unstemmed |
Productivity Assessment and Schedule Compression Index (PASCI) for project planning |
title_sort |
productivity assessment and schedule compression index (pasci) for project planning |
publishDate |
2003 |
url |
http://eprints.utm.my/id/eprint/471/1/1A_8._Shaiful_Amri_Productivity_Assessment_PAGE_%28133-147%29.pdf http://eprints.utm.my/id/eprint/471/ |
_version_ |
1643643109657018368 |
score |
13.211869 |