Time impact of scheduling simulation for high rise building

Although the long-introduced Industrialised Building System (IBS) has promised to solve and improve the current construction method and scenario in our country, but the IBS method has not gained enough popularity. One of the reasons is due to lack of research works done to quantifying the benefit of...

Full description

Saved in:
Bibliographic Details
Main Authors: Ismail, Asmadi, Mohamad, Mohamad Ibrahim, Yahya, Muhamad Azani
Format: Article
Language:English
Published: Universiti Tun Hussein Onn Malaysia (UTHM) and Concrete Society of Malaysia (CSM) 2010
Subjects:
Online Access:http://eprints.utm.my/id/eprint/39751/2/19
http://eprints.utm.my/id/eprint/39751/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utm.39751
record_format eprints
spelling my.utm.397512017-02-15T02:01:07Z http://eprints.utm.my/id/eprint/39751/ Time impact of scheduling simulation for high rise building Ismail, Asmadi Mohamad, Mohamad Ibrahim Yahya, Muhamad Azani TA Engineering (General). Civil engineering (General) Although the long-introduced Industrialised Building System (IBS) has promised to solve and improve the current construction method and scenario in our country, but the IBS method has not gained enough popularity. One of the reasons is due to lack of research works done to quantifying the benefit of IBS especially in construction time saving. In lieu with such scenario, this study conducted to quantify evidence of time saving in IBS application. The methodology adopted for this study is by modelling the construction process for high-rise residential building for both conventional and IBS with shared more a less the same nature and size of the structure. The model was developed using Primavera (P3) project planning software. The comparison was made by comparing selective building components for both method of construction. Different high-rise residential projects have been selected for this study. The result of the study clearly indicated that sufficient time saving can be archived. Also from this study shown not all IBS components can improved to the overall construction duration, however by adopting IBS components can improve and expedite the construction of 18 stories residential building from the point of departure of the project throughout of the whole of project’s with a total 405 days or 42% the time saving. Universiti Tun Hussein Onn Malaysia (UTHM) and Concrete Society of Malaysia (CSM) 2010-12 Article PeerReviewed text/html en http://eprints.utm.my/id/eprint/39751/2/19 Ismail, Asmadi and Mohamad, Mohamad Ibrahim and Yahya, Muhamad Azani (2010) Time impact of scheduling simulation for high rise building. International Journal of Sustainable Construction Engineering & Technology, 1 (2). pp. 55-63. ISSN 2180-3242
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
language English
topic TA Engineering (General). Civil engineering (General)
spellingShingle TA Engineering (General). Civil engineering (General)
Ismail, Asmadi
Mohamad, Mohamad Ibrahim
Yahya, Muhamad Azani
Time impact of scheduling simulation for high rise building
description Although the long-introduced Industrialised Building System (IBS) has promised to solve and improve the current construction method and scenario in our country, but the IBS method has not gained enough popularity. One of the reasons is due to lack of research works done to quantifying the benefit of IBS especially in construction time saving. In lieu with such scenario, this study conducted to quantify evidence of time saving in IBS application. The methodology adopted for this study is by modelling the construction process for high-rise residential building for both conventional and IBS with shared more a less the same nature and size of the structure. The model was developed using Primavera (P3) project planning software. The comparison was made by comparing selective building components for both method of construction. Different high-rise residential projects have been selected for this study. The result of the study clearly indicated that sufficient time saving can be archived. Also from this study shown not all IBS components can improved to the overall construction duration, however by adopting IBS components can improve and expedite the construction of 18 stories residential building from the point of departure of the project throughout of the whole of project’s with a total 405 days or 42% the time saving.
format Article
author Ismail, Asmadi
Mohamad, Mohamad Ibrahim
Yahya, Muhamad Azani
author_facet Ismail, Asmadi
Mohamad, Mohamad Ibrahim
Yahya, Muhamad Azani
author_sort Ismail, Asmadi
title Time impact of scheduling simulation for high rise building
title_short Time impact of scheduling simulation for high rise building
title_full Time impact of scheduling simulation for high rise building
title_fullStr Time impact of scheduling simulation for high rise building
title_full_unstemmed Time impact of scheduling simulation for high rise building
title_sort time impact of scheduling simulation for high rise building
publisher Universiti Tun Hussein Onn Malaysia (UTHM) and Concrete Society of Malaysia (CSM)
publishDate 2010
url http://eprints.utm.my/id/eprint/39751/2/19
http://eprints.utm.my/id/eprint/39751/
_version_ 1643650357706883072
score 13.211869