Earthwork activities in private housing industry

The success and failure of a housing project depends on the earthwork activities as it is the first activity in any housing development project. In many instances, many unforeseen circumstances that affect the estimates of plant performance, output, and hence the duration of activities, fall short o...

Full description

Saved in:
Bibliographic Details
Main Author: Lam, Yuen Siong
Format: Thesis
Language:English
Published: 2005
Subjects:
Online Access:http://eprints.utm.my/id/eprint/3703/1/LamYuenSiongMFKA2005.pdf
http://eprints.utm.my/id/eprint/3703/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utm.3703
record_format eprints
spelling my.utm.37032018-01-10T03:51:18Z http://eprints.utm.my/id/eprint/3703/ Earthwork activities in private housing industry Lam, Yuen Siong TA Engineering (General). Civil engineering (General) The success and failure of a housing project depends on the earthwork activities as it is the first activity in any housing development project. In many instances, many unforeseen circumstances that affect the estimates of plant performance, output, and hence the duration of activities, fall short of the actual situation once construction start. The purpose of this study is to study the earthmoving operation in a private housing development project, to study the earthmoving production in a private housing development project, to identify the problems faced by the contractors during the earthmoving activities and to identify the factors that influence the contractors pricing during bidding. Data was gathered from the local construction organizations by means of a survey questionnaire which was further analyzed using the average index computation to portray the ranking of the associated factors. A comparison of earthmoving production using the average cycle time based on earthmoving production estimating table and the motion and time study conducted at one of the project site. The finding revealed that generally earthwork procedure for private housing project does not emphasize on the environmental and quality control and thus the works carried out do not follow the standard JKR specification. It was apparent that there is not much variation from the earthmoving production estimating table for the excavator cycle time as compare to the excavator cycle time from the motion and time study during construction. The main problems that the contractor faced stem from the client’s decision and confirmation on the final platform levels of the projects, the design provided by the consultant and the inaccurate survey information. The final pricing during bidding was highly influence by the client’s reputation to pay and the financial status which normally depends on the sale of the houses built 2005-11 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/id/eprint/3703/1/LamYuenSiongMFKA2005.pdf Lam, Yuen Siong (2005) Earthwork activities in private housing industry. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering.
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
language English
topic TA Engineering (General). Civil engineering (General)
spellingShingle TA Engineering (General). Civil engineering (General)
Lam, Yuen Siong
Earthwork activities in private housing industry
description The success and failure of a housing project depends on the earthwork activities as it is the first activity in any housing development project. In many instances, many unforeseen circumstances that affect the estimates of plant performance, output, and hence the duration of activities, fall short of the actual situation once construction start. The purpose of this study is to study the earthmoving operation in a private housing development project, to study the earthmoving production in a private housing development project, to identify the problems faced by the contractors during the earthmoving activities and to identify the factors that influence the contractors pricing during bidding. Data was gathered from the local construction organizations by means of a survey questionnaire which was further analyzed using the average index computation to portray the ranking of the associated factors. A comparison of earthmoving production using the average cycle time based on earthmoving production estimating table and the motion and time study conducted at one of the project site. The finding revealed that generally earthwork procedure for private housing project does not emphasize on the environmental and quality control and thus the works carried out do not follow the standard JKR specification. It was apparent that there is not much variation from the earthmoving production estimating table for the excavator cycle time as compare to the excavator cycle time from the motion and time study during construction. The main problems that the contractor faced stem from the client’s decision and confirmation on the final platform levels of the projects, the design provided by the consultant and the inaccurate survey information. The final pricing during bidding was highly influence by the client’s reputation to pay and the financial status which normally depends on the sale of the houses built
format Thesis
author Lam, Yuen Siong
author_facet Lam, Yuen Siong
author_sort Lam, Yuen Siong
title Earthwork activities in private housing industry
title_short Earthwork activities in private housing industry
title_full Earthwork activities in private housing industry
title_fullStr Earthwork activities in private housing industry
title_full_unstemmed Earthwork activities in private housing industry
title_sort earthwork activities in private housing industry
publishDate 2005
url http://eprints.utm.my/id/eprint/3703/1/LamYuenSiongMFKA2005.pdf
http://eprints.utm.my/id/eprint/3703/
_version_ 1643643871941361664
score 13.211869