Turbine generator synchronization - two case studies
This article presents two case studies of increased vibrations associated with load dispatch and removal from gas turbine-driven synchronous generators during electrical supply synchronization. The first case involves a classical uneven air gap fault due to a loose foot on the generator. Such faults...
Saved in:
Main Authors: | Leong, Mohd. Salman, Lim, Meng Hee, Guai, Yeu Kae |
---|---|
Format: | Article |
Published: |
Elsevier
2012
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/33917/ http://www.sandv.com/downloads/1205leon.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Turbine blade crack detection using vibration testing methods
by: Guai, Yeu Kae
Published: (2009) -
Diagnosis for loose blades in gas turbines using wavelet analysis
by: Meng, Hee Lim, et al.
Published: (2005) -
A laboratory and field study of industrial gas turbine blade faults diagnosis
by: Lim, Meng Hee
Published: (2003) -
Condition monitoring of industrial gas turbine critical operating parameters using statistical process control charts
by: Jeyabalan, Harindharan, et al.
Published: (2015) -
The study on the performance of the gas turbine for power generation
by: Mohd Aidil, Zaini
Published: (2008)