Selection of the industrialized building material supplier by analytic hierarchy process method
Industrialized Building system (IBS) aims to expedite the process of installation and construction at site. Industrialized Building System (IBS) is a construction system that is built using pre-fabricated components. The manufacturing of the components is systematically done using machine, formworks...
Saved in:
Main Author: | Moravveji, Mohammad Yousef |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2013
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/33277/1/MohammadYousefMoravvejiMFKA2013.pdf http://eprints.utm.my/id/eprint/33277/ http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:76595?queryType=vitalDismax&query=Selection+of+the+industrialized+building+material+supplier+by+analytic+hierarchy+process+method&public=true |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Selection of the industrilized building material supplier by analytic hierarchy process method
by: Moravveji, Mohammad Yousef
Published: (2013) -
Selection of material suppliers by the contractors in the construction industry
by: Ahankoob, Alireza
Published: (2013) -
Selection of contractor by Using Analytical Hierarchy Process (AHP)
by: Putri Zulaiha, Razi, et al.
Published: (2020) -
Selection of Best Consultant by using Analytical Hierarchy Process (AHP)
by: Putri Zulaiha, Razi, et al.
Published: (2020) -
Identification of critical barriers of industrialized building system (IBS) in construction industry: Analysis using the analytical hierarchy process (AHP)
by: Ghazali, Norhaniza, et al.
Published: (2015)