Time measurement for improvement for construction using deming theory
Saved in:
Main Author: | Kabirifar, Kamyar |
---|---|
Format: | Thesis |
Published: |
2012
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/32641/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Quality research framework: Enumerative study versus analytic study from Deming’s perspective
by: Kang, Eng Thye
Published: (2011) -
Charles İstifa mı demeli? (Should it be said Charles Resign?)
by: Kayadibi, Saim
Published: (2016) -
Quality research framework: Enumerative study vs. analytic study from Deming’s perspective
by: Kang, Eng Thye
Published: (2010) -
Sumbangan Dr. W. E. Deming
Terhadap Corak Pengurusan Kualiti
Syarikat-Syarikat Multinasional Di Malaysia
by: Chua, Chae Hiang
Published: (1998) -
Improving cost and time control in construction using building information model (Bim): A review
by: Muhammad Tahir, Muhammad, et al.
Published: (2018)