The development of automated system for evaluating design changes fee using BIM support

Traditional methods of evaluating design changes fee in construction projects often lead to dispute. Sometimes it leads to unacceptable claim because it is not easy for consultant engineers to justify the amount of changes they have performed. This study has been done with the aim to propose the new...

Full description

Saved in:
Bibliographic Details
Main Author: Shourangiz, Ehsan
Format: Thesis
Language:English
Published: 2012
Subjects:
Online Access:http://eprints.utm.my/id/eprint/32585/1/EhsanShourangizMFKA2012.pdf
http://eprints.utm.my/id/eprint/32585/
http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:70425?site_name=Restricted Repository
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utm.32585
record_format eprints
spelling my.utm.325852017-08-22T07:21:26Z http://eprints.utm.my/id/eprint/32585/ The development of automated system for evaluating design changes fee using BIM support Shourangiz, Ehsan T Technology (General) Traditional methods of evaluating design changes fee in construction projects often lead to dispute. Sometimes it leads to unacceptable claim because it is not easy for consultant engineers to justify the amount of changes they have performed. This study has been done with the aim to propose the new approach of evaluating the additional work done due to design changes by using BIM (Building information models) system. The methodologies used for this study are literature reviews and interviews with the construction professionals. In addition, a building model is simulated in “Autodesk Revit Structure” software to illustrate the process of automated system for evaluating design changes fee. The findings showed that the most current method practice in Malaysia is based on the Percentage of Construction Cost, Salary Cost Times Multiplier and Man-Hour. This study has developed an alternative method using BIM for assessing the additional design changes fee based on the construction cost which derived from BIM’s quantity take-offs automated system. The result of the benefit of the newly proposed system has been validated through interviews with expert panels. It is hope that this method will be more acceptable by Malaysian construction industry players in the future considering the benefit of this approach as establish in this study. 2012 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/id/eprint/32585/1/EhsanShourangizMFKA2012.pdf Shourangiz, Ehsan (2012) The development of automated system for evaluating design changes fee using BIM support. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:70425?site_name=Restricted Repository
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
language English
topic T Technology (General)
spellingShingle T Technology (General)
Shourangiz, Ehsan
The development of automated system for evaluating design changes fee using BIM support
description Traditional methods of evaluating design changes fee in construction projects often lead to dispute. Sometimes it leads to unacceptable claim because it is not easy for consultant engineers to justify the amount of changes they have performed. This study has been done with the aim to propose the new approach of evaluating the additional work done due to design changes by using BIM (Building information models) system. The methodologies used for this study are literature reviews and interviews with the construction professionals. In addition, a building model is simulated in “Autodesk Revit Structure” software to illustrate the process of automated system for evaluating design changes fee. The findings showed that the most current method practice in Malaysia is based on the Percentage of Construction Cost, Salary Cost Times Multiplier and Man-Hour. This study has developed an alternative method using BIM for assessing the additional design changes fee based on the construction cost which derived from BIM’s quantity take-offs automated system. The result of the benefit of the newly proposed system has been validated through interviews with expert panels. It is hope that this method will be more acceptable by Malaysian construction industry players in the future considering the benefit of this approach as establish in this study.
format Thesis
author Shourangiz, Ehsan
author_facet Shourangiz, Ehsan
author_sort Shourangiz, Ehsan
title The development of automated system for evaluating design changes fee using BIM support
title_short The development of automated system for evaluating design changes fee using BIM support
title_full The development of automated system for evaluating design changes fee using BIM support
title_fullStr The development of automated system for evaluating design changes fee using BIM support
title_full_unstemmed The development of automated system for evaluating design changes fee using BIM support
title_sort development of automated system for evaluating design changes fee using bim support
publishDate 2012
url http://eprints.utm.my/id/eprint/32585/1/EhsanShourangizMFKA2012.pdf
http://eprints.utm.my/id/eprint/32585/
http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:70425?site_name=Restricted Repository
_version_ 1643649083787706368
score 13.211869