Risk allocation of foreign funded infrastructure project a case study in south east Sulawesi

The role of foreign investment in infrastructure development in Indonesia is quite significant. However, foreign funded infrastructure projects are considered as high risk business. Meanwhile, unmanaged or unmitigated risks are one of the primary causes of project failure. This research discusses ri...

Full description

Saved in:
Bibliographic Details
Main Author: Hasworo, Maul
Format: Thesis
Language:English
Published: 2012
Subjects:
Online Access:http://eprints.utm.my/id/eprint/32490/5/MaulHasworoMFAB2012.pdf
http://eprints.utm.my/id/eprint/32490/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utm.32490
record_format eprints
spelling my.utm.324902018-04-27T01:21:57Z http://eprints.utm.my/id/eprint/32490/ Risk allocation of foreign funded infrastructure project a case study in south east Sulawesi Hasworo, Maul HC Economic History and Conditions The role of foreign investment in infrastructure development in Indonesia is quite significant. However, foreign funded infrastructure projects are considered as high risk business. Meanwhile, unmanaged or unmitigated risks are one of the primary causes of project failure. This research discusses risk allocation in contract clauses of EINRIP project in Southeast Sulawesi Province in Indonesia, by taking account contractual party’s perspective on potential risks in the project, based on their initial sources, and their magnitude on project’s performances, namely quality, time and budget. Among 50 risks identified in this research based on their initial sources, it was found that only 16 risks are significant to the project performance. The risks at national/regional level consist of inconsistence of government policy, inflation rate increasing, currency exchange fluctuation, tax rate increasing, and culture tradition differences. The risks at construction industry level involve non-standard contract form and differences in legal relationship between partners. The risks at company/project management level entail disadvantage contract, unclear detail design or specification, unfavorable sub-contractor, default supply of materials, equipments and plants and human resource shortage. The risks at project implementation level engage damage by human errors, incomplete design, and bad weather. However not all these risks are contained in contract through clauses. There are only thirteen risks that contained in the contract namely inconsistence of government policy, inflation rate increasing, currency exchange fluctuation, tax rate increasing, culture tradition differences, unclear detail design or specification, unfavorable sub-contractor, default supply of materials, equipments and plants, human resource shortage damage by human errors, incomplete design, and bad weather. While three risks are not contained in the contract namely non standard contract form, differences in legal relationship between partners, disadvantage contract. However these unstated risks are able to be omitted by the use of MDB Harmonised Conditions of Contract for Construction as the standard form of contract in this project. As addition, the application of Project Management Manual (PMM) as the guidance in implementing the project is pivotal. Therefore it can be concluded that MDB Harmonised Condition of Contract for Construction is able to cope with the risks that possible to occur in this project. 2012-08 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/id/eprint/32490/5/MaulHasworoMFAB2012.pdf Hasworo, Maul (2012) Risk allocation of foreign funded infrastructure project a case study in south east Sulawesi. Masters thesis, Universiti Teknologi Malaysia, Faculty of Built Environment.
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
language English
topic HC Economic History and Conditions
spellingShingle HC Economic History and Conditions
Hasworo, Maul
Risk allocation of foreign funded infrastructure project a case study in south east Sulawesi
description The role of foreign investment in infrastructure development in Indonesia is quite significant. However, foreign funded infrastructure projects are considered as high risk business. Meanwhile, unmanaged or unmitigated risks are one of the primary causes of project failure. This research discusses risk allocation in contract clauses of EINRIP project in Southeast Sulawesi Province in Indonesia, by taking account contractual party’s perspective on potential risks in the project, based on their initial sources, and their magnitude on project’s performances, namely quality, time and budget. Among 50 risks identified in this research based on their initial sources, it was found that only 16 risks are significant to the project performance. The risks at national/regional level consist of inconsistence of government policy, inflation rate increasing, currency exchange fluctuation, tax rate increasing, and culture tradition differences. The risks at construction industry level involve non-standard contract form and differences in legal relationship between partners. The risks at company/project management level entail disadvantage contract, unclear detail design or specification, unfavorable sub-contractor, default supply of materials, equipments and plants and human resource shortage. The risks at project implementation level engage damage by human errors, incomplete design, and bad weather. However not all these risks are contained in contract through clauses. There are only thirteen risks that contained in the contract namely inconsistence of government policy, inflation rate increasing, currency exchange fluctuation, tax rate increasing, culture tradition differences, unclear detail design or specification, unfavorable sub-contractor, default supply of materials, equipments and plants, human resource shortage damage by human errors, incomplete design, and bad weather. While three risks are not contained in the contract namely non standard contract form, differences in legal relationship between partners, disadvantage contract. However these unstated risks are able to be omitted by the use of MDB Harmonised Conditions of Contract for Construction as the standard form of contract in this project. As addition, the application of Project Management Manual (PMM) as the guidance in implementing the project is pivotal. Therefore it can be concluded that MDB Harmonised Condition of Contract for Construction is able to cope with the risks that possible to occur in this project.
format Thesis
author Hasworo, Maul
author_facet Hasworo, Maul
author_sort Hasworo, Maul
title Risk allocation of foreign funded infrastructure project a case study in south east Sulawesi
title_short Risk allocation of foreign funded infrastructure project a case study in south east Sulawesi
title_full Risk allocation of foreign funded infrastructure project a case study in south east Sulawesi
title_fullStr Risk allocation of foreign funded infrastructure project a case study in south east Sulawesi
title_full_unstemmed Risk allocation of foreign funded infrastructure project a case study in south east Sulawesi
title_sort risk allocation of foreign funded infrastructure project a case study in south east sulawesi
publishDate 2012
url http://eprints.utm.my/id/eprint/32490/5/MaulHasworoMFAB2012.pdf
http://eprints.utm.my/id/eprint/32490/
_version_ 1643649055316770816
score 13.211869