Towards implementing reactive scheduling for job shop problem
Most of the research literature concerning scheduling concentrates on the static problems, i.e problems where all input data is known and does not change over time. However, the real world scheduling problems are very seldom static. Events like machine breakdown or bottleneck in some situation impos...
Saved in:
Main Authors: | Zakaria, Zalmiyah, Deris, Safaai |
---|---|
Format: | Conference or Workshop Item |
Language: | English |
Published: |
2006
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/2276/1/SafaaiDeris2006_TowardsImplementingReactiveScheduling.pdf http://eprints.utm.my/id/eprint/2276/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Ontology and problem-solving method for scheduling in manufacturing
by: Mustapha, Muhamad Firdaus, et al.
Published: (2007) -
An artificial immune system for solving production scheduling problems: a review
by: Muhamad, Ahmad Shahrizal, et al.
Published: (2013) -
Efficient dispatching rules for dynamic job shop scheduling
by: P.D.D., Dominic, et al.
Published: (2004) -
Petri Nets modeling of a real world manufacturing processes
by: Zakaria, Zalmiyah, et al.
Published: (2008) -
Operation sequencing using modified particle swarm optimization
by: Zakaria, Zalmiyah, et al.
Published: (2007)