Variation orders in Universiti Teknologi Malaysia (UTM) construction projects
The project holder have to believe that no construction method or for that matter the project, is free of variation and it’s afterward activity of claims. A document review was done for 18 numbers of construction contract documentation projects in Universiti Teknologi Malaysia (UTM) during the per...
Saved in:
Main Author: | Ibrahim, Nor Hayati |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2006
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/2079/1/NorHayatiIbrahimMFKA2006.pdf http://eprints.utm.my/id/eprint/2079/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Variation Orders Causes in Construction Buildings Projects in Jordan
by: Albtoosh, Ja’far A. Aldibat, et al.
Published: (2017) -
Minimizing variation order on construction project due to design change
by: Hamdan, Hazrin
Published: (2012) -
Variation orders in transmission projects of Tenaga Nasional Berhad
by: Abdul Kudus, Baharuddin
Published: (2005) -
A Study On Variations In Sewerage Construction Projects
by: Kassim, Mohd. Azraai, et al.
Published: (2002) -
Construction site noise control : a case study for UTM's project
by: Nateghi, Fatemeh
Published: (2009)