The enforceability of liquidated and ascertained damages in construction contract
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Published: |
2009
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/18291/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.utm.18291 |
---|---|
record_format |
eprints |
spelling |
my.utm.182912011-11-18T04:32:57Z http://eprints.utm.my/id/eprint/18291/ The enforceability of liquidated and ascertained damages in construction contract Chia, Eunice Mei Ling Unspecified 2009 Thesis NonPeerReviewed Chia, Eunice Mei Ling (2009) The enforceability of liquidated and ascertained damages in construction contract. Masters thesis, Universiti Teknologi Malaysia, Faculty of Built Environment. |
institution |
Universiti Teknologi Malaysia |
building |
UTM Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Malaysia |
content_source |
UTM Institutional Repository |
url_provider |
http://eprints.utm.my/ |
topic |
Unspecified |
spellingShingle |
Unspecified Chia, Eunice Mei Ling The enforceability of liquidated and ascertained damages in construction contract |
format |
Thesis |
author |
Chia, Eunice Mei Ling |
author_facet |
Chia, Eunice Mei Ling |
author_sort |
Chia, Eunice Mei Ling |
title |
The enforceability of liquidated and ascertained damages in construction contract |
title_short |
The enforceability of liquidated and ascertained damages in construction contract |
title_full |
The enforceability of liquidated and ascertained damages in construction contract |
title_fullStr |
The enforceability of liquidated and ascertained damages in construction contract |
title_full_unstemmed |
The enforceability of liquidated and ascertained damages in construction contract |
title_sort |
enforceability of liquidated and ascertained damages in construction contract |
publishDate |
2009 |
url |
http://eprints.utm.my/id/eprint/18291/ |
_version_ |
1643646855790198784 |
score |
13.211869 |