Contractor's right to claim for extra works
Saved in:
Main Author: | Yap, Chiaw Guan |
---|---|
Format: | Thesis |
Published: |
2009
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/18211/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Liability of the specialist contractor in construction work
by: Samion, Joharudin
Published: (2008) -
Claim due to discrepancies in contract documents
by: Ibrahim, Wan Azlina
Published: (2009) -
Evidence that are needed to claim for direct loss and
by: Badruddin, Husna
Published: (2008) -
Determination of contract by contractor
by: Wan Ali, Wan Nordiana
Published: (2006) -
Termination of contract by contractor
by: Borhanudin, Noor Hasiken
Published: (2008)