The development of a business framework and techno-financial model for biomass power plants
Renewable Energy (RE) was included in the 8th Malaysia Plan to ensure a sustainable energy growth for the country. An initial target of 600MW grid connected power plants, fuelled by RE sources, was set by the year 2005. However, their planting up have been sluggish. Only a few of the 62 approvals ha...
Saved in:
Main Author: | Abdul Latif, Abdul Maulud |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2005
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/1349/1/AbdulMauludAbdulLatifPBATC2005.pdf http://eprints.utm.my/id/eprint/1349/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
The techno-financial model to determine the financial viability of Biomass Power Plants
by: Maulud, Hj. Latif, Dr.
Published: (2011) -
The business framework in the implementation of a biomass power plant
by: Maulud, Latif, Dr.
Published: (2011) -
Coal Fuel Efficiency with Mixed Palm Shell Biomass for Steam Power Plant
by: Hamzah, Eteruddin, et al.
Published: (2021) -
Physical security measures framework for Marib power plant
by: Mohammed Al-Aghbari, Anas Mustafa
Published: (2013) -
Techno-Economic Study of Substation Electric Power in Indonesia: A Mini-Review
by: Rosyid Ridlo, Al Hakim, et al.
Published: (2021)