Cost effectiveness comparison of pre-fabrication with conventional construction method for RMAF ground defense bunker

Pre-fabrication construction method is not new in Malaysian construction industry yet the utilization of such method still relatively low. Government should conduct thorough study of pre-fabrication method aspects and implement it widely especially for government based projects including national se...

Full description

Saved in:
Bibliographic Details
Main Author: Tan, Swee Kok
Format: Thesis
Language:English
Published: 2010
Subjects:
Online Access:http://eprints.utm.my/id/eprint/10636/6/TanSweeKokMFKA2010.pdf
http://eprints.utm.my/id/eprint/10636/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utm.10636
record_format eprints
spelling my.utm.106362017-09-26T04:10:51Z http://eprints.utm.my/id/eprint/10636/ Cost effectiveness comparison of pre-fabrication with conventional construction method for RMAF ground defense bunker Tan, Swee Kok TH Building construction Pre-fabrication construction method is not new in Malaysian construction industry yet the utilization of such method still relatively low. Government should conduct thorough study of pre-fabrication method aspects and implement it widely especially for government based projects including national security development projects as well. Pre-fabrication method is a modern construction method that widely use by developed countries and it proven that to be more cost effective and cost saving on the aspect of cost, labor, time, quality and durability. Pilot project of bunker construction in Kuantan Airbase (KAB) has chosen as case study for this research. While data required for this case study was generated from site survey, interview segment and construction cost comparison of prefabrication with conventional bunker construction. The findings showed that none of defense bunkers were fully complied with specifications. Majority of respondents agreed that current construction method caused several problems to RMAF and PWD. Pre-fabrication method was foresees contributed solutions to overcome current problems and furthermore this study identified that pre-fabrication is cost effectiveness for implementation. Recommendations suggested to improve current construction caused problems on site by imposing clear delegations and responsibilities for stakeholders whereas encourage cost information transparency provided by PWD. The primary aim and objectives of this study has been accomplished successfully in which the findings have eliminated uncertainties and arguments on prefabrication method cost effectiveness. Majority of respondents gave a feedback that pre-fabricated bunkers implementation are possibility for mass implementation of prefabricated bunkers in 10th Malaysian Plan in all RMAF Bases. This action will save financial of RMAF defense. 2010-04 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/id/eprint/10636/6/TanSweeKokMFKA2010.pdf Tan, Swee Kok (2010) Cost effectiveness comparison of pre-fabrication with conventional construction method for RMAF ground defense bunker. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering.
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
language English
topic TH Building construction
spellingShingle TH Building construction
Tan, Swee Kok
Cost effectiveness comparison of pre-fabrication with conventional construction method for RMAF ground defense bunker
description Pre-fabrication construction method is not new in Malaysian construction industry yet the utilization of such method still relatively low. Government should conduct thorough study of pre-fabrication method aspects and implement it widely especially for government based projects including national security development projects as well. Pre-fabrication method is a modern construction method that widely use by developed countries and it proven that to be more cost effective and cost saving on the aspect of cost, labor, time, quality and durability. Pilot project of bunker construction in Kuantan Airbase (KAB) has chosen as case study for this research. While data required for this case study was generated from site survey, interview segment and construction cost comparison of prefabrication with conventional bunker construction. The findings showed that none of defense bunkers were fully complied with specifications. Majority of respondents agreed that current construction method caused several problems to RMAF and PWD. Pre-fabrication method was foresees contributed solutions to overcome current problems and furthermore this study identified that pre-fabrication is cost effectiveness for implementation. Recommendations suggested to improve current construction caused problems on site by imposing clear delegations and responsibilities for stakeholders whereas encourage cost information transparency provided by PWD. The primary aim and objectives of this study has been accomplished successfully in which the findings have eliminated uncertainties and arguments on prefabrication method cost effectiveness. Majority of respondents gave a feedback that pre-fabricated bunkers implementation are possibility for mass implementation of prefabricated bunkers in 10th Malaysian Plan in all RMAF Bases. This action will save financial of RMAF defense.
format Thesis
author Tan, Swee Kok
author_facet Tan, Swee Kok
author_sort Tan, Swee Kok
title Cost effectiveness comparison of pre-fabrication with conventional construction method for RMAF ground defense bunker
title_short Cost effectiveness comparison of pre-fabrication with conventional construction method for RMAF ground defense bunker
title_full Cost effectiveness comparison of pre-fabrication with conventional construction method for RMAF ground defense bunker
title_fullStr Cost effectiveness comparison of pre-fabrication with conventional construction method for RMAF ground defense bunker
title_full_unstemmed Cost effectiveness comparison of pre-fabrication with conventional construction method for RMAF ground defense bunker
title_sort cost effectiveness comparison of pre-fabrication with conventional construction method for rmaf ground defense bunker
publishDate 2010
url http://eprints.utm.my/id/eprint/10636/6/TanSweeKokMFKA2010.pdf
http://eprints.utm.my/id/eprint/10636/
_version_ 1643645457110401024
score 13.211869