Multi-criteria decision-making prototype for the 4th construction revolution implementation readiness using intellectual capital perspective

The fourth industrial revolution, so-called Industry 4.0 has transformed the decision-making process by increasing the use of information and digitisation technologies, which resulted in improving the performance and structuring the management process to the industry. Thus, in recent years, the impl...

Full description

Saved in:
Bibliographic Details
Main Author: Mansour, Husam Tahseen Mansour
Format: Thesis
Language:English
Published: 2022
Subjects:
Online Access:http://eprints.utm.my/id/eprint/101480/1/HusamTahseenMansourPSKA2022.pdf
http://eprints.utm.my/id/eprint/101480/
http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:150581
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utm.101480
record_format eprints
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
language English
topic TA Engineering (General). Civil engineering (General)
spellingShingle TA Engineering (General). Civil engineering (General)
Mansour, Husam Tahseen Mansour
Multi-criteria decision-making prototype for the 4th construction revolution implementation readiness using intellectual capital perspective
description The fourth industrial revolution, so-called Industry 4.0 has transformed the decision-making process by increasing the use of information and digitisation technologies, which resulted in improving the performance and structuring the management process to the industry. Thus, in recent years, the implementation level of information and digitisation technologies in the construction industry, termed as ‘Construction 4.0 (CR4.0)’, has increased rapidly. However, the construction industry has been unable to translate its acquired knowledge into actionable, transformational and strategic goals towards CR4.0. CR4.0 has changed the nature of competitive resources by reshaping the structure and way construction firms work. Construction firms face various technological, human, and process-related challenges. The starting point for this research was based on exploring the potentials in reskilling and upskilling knowledge through the development of Intellectual Capital (IC) of the construction firms. As a result, based on the Resource-based View theory, CR4.0 implementation process has been approached as a knowledge-based innovation which occurred with the development of three IC capitals: Human Capital (HC), Relationship Capital (RC) and Structure Capital (SC ). Hence, this research aims to develop a Multi-Criteria Decision-Making (MCDM) prototype, used to support decision-making in CR4.0 readiness, named as the 'Construction Firm's Industry 4.0 Readiness MCDM (ConFIRM)’. The first objective is to identify the critical criteria of IC that may affect the CR4.0 implementation readiness. The process involved Systematic Literature review and semi-structured interviews. The second objective is to investigate the significant level of IC affecting CR4.0 implementation readiness through Analytical Hierarchy Process (AHP) technique. The third objective is to derive the weightage of criteria and sub-criteria of ConFIRM through Decision-Making Trial and Evaluation Laboratory (DEMATEL) and Analytic Network Process (ANP). The fourth objective is to develop a prototype called as ConFIRM that comprising of 3 main criteria, 16 sub-criteria and 92 super sub-criteria according to their significance weightage in achieving CR4.0 implementation readiness. The MCDM results indicated HC (37%) to be the most critical CR4.0 main criteria, followed by SC (34%), and RC (29%) respectively. The HC represented the cumulative tacit knowledge within the organisation, and it would be the main generator of intangibles. For the sub-criteria level, the results indicated that “Management Capital (12%)” has been considered the most critical CR4.0 sub-criteria. The second most critical sub-criteria would be the “Experience Capital (10%)”, followed by “Process Capital (8%)”. On the other hand, the “Sustainable Capital (2%)” was the least critical sub-criteria. Then, the weightages were formulated into automated MCDM prototype, where the scores were calculated using the Technique for Order of Preference by Similarity to Ideal Solution (TOPSIS), indicating the CR4.0 implementation readiness. As for the fourth objective, ConFIRM was adopted in real case studies and evaluated based on the judgement of five experts to determine its applicability and validity in evaluating CR4.0 readiness of contracting firms in Malaysia. In the case studies, the experts recognised the performance and effectiveness of ConFIRM as the novel method for CR4.0 readiness evaluation. ConFIRM would be able to add value to the development of CR4.0 strategies by identifying the corrective/preventive actions needed, based on the readiness assessment, before the start of the implementation process.
format Thesis
author Mansour, Husam Tahseen Mansour
author_facet Mansour, Husam Tahseen Mansour
author_sort Mansour, Husam Tahseen Mansour
title Multi-criteria decision-making prototype for the 4th construction revolution implementation readiness using intellectual capital perspective
title_short Multi-criteria decision-making prototype for the 4th construction revolution implementation readiness using intellectual capital perspective
title_full Multi-criteria decision-making prototype for the 4th construction revolution implementation readiness using intellectual capital perspective
title_fullStr Multi-criteria decision-making prototype for the 4th construction revolution implementation readiness using intellectual capital perspective
title_full_unstemmed Multi-criteria decision-making prototype for the 4th construction revolution implementation readiness using intellectual capital perspective
title_sort multi-criteria decision-making prototype for the 4th construction revolution implementation readiness using intellectual capital perspective
publishDate 2022
url http://eprints.utm.my/id/eprint/101480/1/HusamTahseenMansourPSKA2022.pdf
http://eprints.utm.my/id/eprint/101480/
http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:150581
_version_ 1769842061302824960
spelling my.utm.1014802023-06-21T10:10:45Z http://eprints.utm.my/id/eprint/101480/ Multi-criteria decision-making prototype for the 4th construction revolution implementation readiness using intellectual capital perspective Mansour, Husam Tahseen Mansour TA Engineering (General). Civil engineering (General) The fourth industrial revolution, so-called Industry 4.0 has transformed the decision-making process by increasing the use of information and digitisation technologies, which resulted in improving the performance and structuring the management process to the industry. Thus, in recent years, the implementation level of information and digitisation technologies in the construction industry, termed as ‘Construction 4.0 (CR4.0)’, has increased rapidly. However, the construction industry has been unable to translate its acquired knowledge into actionable, transformational and strategic goals towards CR4.0. CR4.0 has changed the nature of competitive resources by reshaping the structure and way construction firms work. Construction firms face various technological, human, and process-related challenges. The starting point for this research was based on exploring the potentials in reskilling and upskilling knowledge through the development of Intellectual Capital (IC) of the construction firms. As a result, based on the Resource-based View theory, CR4.0 implementation process has been approached as a knowledge-based innovation which occurred with the development of three IC capitals: Human Capital (HC), Relationship Capital (RC) and Structure Capital (SC ). Hence, this research aims to develop a Multi-Criteria Decision-Making (MCDM) prototype, used to support decision-making in CR4.0 readiness, named as the 'Construction Firm's Industry 4.0 Readiness MCDM (ConFIRM)’. The first objective is to identify the critical criteria of IC that may affect the CR4.0 implementation readiness. The process involved Systematic Literature review and semi-structured interviews. The second objective is to investigate the significant level of IC affecting CR4.0 implementation readiness through Analytical Hierarchy Process (AHP) technique. The third objective is to derive the weightage of criteria and sub-criteria of ConFIRM through Decision-Making Trial and Evaluation Laboratory (DEMATEL) and Analytic Network Process (ANP). The fourth objective is to develop a prototype called as ConFIRM that comprising of 3 main criteria, 16 sub-criteria and 92 super sub-criteria according to their significance weightage in achieving CR4.0 implementation readiness. The MCDM results indicated HC (37%) to be the most critical CR4.0 main criteria, followed by SC (34%), and RC (29%) respectively. The HC represented the cumulative tacit knowledge within the organisation, and it would be the main generator of intangibles. For the sub-criteria level, the results indicated that “Management Capital (12%)” has been considered the most critical CR4.0 sub-criteria. The second most critical sub-criteria would be the “Experience Capital (10%)”, followed by “Process Capital (8%)”. On the other hand, the “Sustainable Capital (2%)” was the least critical sub-criteria. Then, the weightages were formulated into automated MCDM prototype, where the scores were calculated using the Technique for Order of Preference by Similarity to Ideal Solution (TOPSIS), indicating the CR4.0 implementation readiness. As for the fourth objective, ConFIRM was adopted in real case studies and evaluated based on the judgement of five experts to determine its applicability and validity in evaluating CR4.0 readiness of contracting firms in Malaysia. In the case studies, the experts recognised the performance and effectiveness of ConFIRM as the novel method for CR4.0 readiness evaluation. ConFIRM would be able to add value to the development of CR4.0 strategies by identifying the corrective/preventive actions needed, based on the readiness assessment, before the start of the implementation process. 2022 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/id/eprint/101480/1/HusamTahseenMansourPSKA2022.pdf Mansour, Husam Tahseen Mansour (2022) Multi-criteria decision-making prototype for the 4th construction revolution implementation readiness using intellectual capital perspective. PhD thesis, Universiti Teknologi Malaysia. http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:150581
score 13.211869