Critical Factors and Mitigating Measures of Construction Delays of Pakistani Building Construction Projects

The construction industry is a significant contributor to a country's Gross Domestic Product (GDP). However, construction projects often face many issues especially delay. It is a key contributor to project failure, leading to cost overruns and a decline in quality standards. This study aims to...

Full description

Saved in:
Bibliographic Details
Main Authors: Irfanullah, Irfanullah, Hasmoril, Muhammad Fikri, Hassan Memon, Mujtaba, Ismail, Radzi
Format: Article
Language:English
Published: uthm 2023
Subjects:
Online Access:http://eprints.uthm.edu.my/9525/1/J16031_967153c8453a3abe1e8fa22bd83b29f9.pdf
http://eprints.uthm.edu.my/9525/
https://doi.org/10,30880/ij
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uthm.eprints.9525
record_format eprints
spelling my.uthm.eprints.95252023-08-02T03:45:16Z http://eprints.uthm.edu.my/9525/ Critical Factors and Mitigating Measures of Construction Delays of Pakistani Building Construction Projects Irfanullah, Irfanullah Hasmoril, Muhammad Fikri Hassan Memon, Mujtaba Ismail, Radzi T Technology (General) The construction industry is a significant contributor to a country's Gross Domestic Product (GDP). However, construction projects often face many issues especially delay. It is a key contributor to project failure, leading to cost overruns and a decline in quality standards. This study aims to identify the critical factors of delay in building construction projects in Pakistan, and its controlling measures of the critical delay factors. A literature review identified 48 common factors of delay in the construction industry worldwide. Based on a structured questionnaire and the average index method, 11 critical factors of delays in building construction projects in Pakistan were identified. Furthermore, a semi-structured questionnaire was used to determine 44 possible mitigation measures which were extracted from literature review with the 11 critical delay factors. The results of this study will be useful for stakeholders in building construction projects in Pakistan. By incorporating the recommended mitigation measures, they can identify and control the most critical factors that can cause delays in building construction projects. This study contributes to the existing literature by providing a better understanding of the factors causing delays in building construction projects in Pakistan and proposing effective measures to mitigate these factors. uthm 2023 Article PeerReviewed text en http://eprints.uthm.edu.my/9525/1/J16031_967153c8453a3abe1e8fa22bd83b29f9.pdf Irfanullah, Irfanullah and Hasmoril, Muhammad Fikri and Hassan Memon, Mujtaba and Ismail, Radzi (2023) Critical Factors and Mitigating Measures of Construction Delays of Pakistani Building Construction Projects. LNTERNATIONAL JOURNAL OF SUSTAINABLE CONSTRUCTION ENGINEERING AND TECHNOLOGY, 14 (2). pp. 240-249. ISSN 2600-7959 https://doi.org/10,30880/ij
institution Universiti Tun Hussein Onn Malaysia
building UTHM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Tun Hussein Onn Malaysia
content_source UTHM Institutional Repository
url_provider http://eprints.uthm.edu.my/
language English
topic T Technology (General)
spellingShingle T Technology (General)
Irfanullah, Irfanullah
Hasmoril, Muhammad Fikri
Hassan Memon, Mujtaba
Ismail, Radzi
Critical Factors and Mitigating Measures of Construction Delays of Pakistani Building Construction Projects
description The construction industry is a significant contributor to a country's Gross Domestic Product (GDP). However, construction projects often face many issues especially delay. It is a key contributor to project failure, leading to cost overruns and a decline in quality standards. This study aims to identify the critical factors of delay in building construction projects in Pakistan, and its controlling measures of the critical delay factors. A literature review identified 48 common factors of delay in the construction industry worldwide. Based on a structured questionnaire and the average index method, 11 critical factors of delays in building construction projects in Pakistan were identified. Furthermore, a semi-structured questionnaire was used to determine 44 possible mitigation measures which were extracted from literature review with the 11 critical delay factors. The results of this study will be useful for stakeholders in building construction projects in Pakistan. By incorporating the recommended mitigation measures, they can identify and control the most critical factors that can cause delays in building construction projects. This study contributes to the existing literature by providing a better understanding of the factors causing delays in building construction projects in Pakistan and proposing effective measures to mitigate these factors.
format Article
author Irfanullah, Irfanullah
Hasmoril, Muhammad Fikri
Hassan Memon, Mujtaba
Ismail, Radzi
author_facet Irfanullah, Irfanullah
Hasmoril, Muhammad Fikri
Hassan Memon, Mujtaba
Ismail, Radzi
author_sort Irfanullah, Irfanullah
title Critical Factors and Mitigating Measures of Construction Delays of Pakistani Building Construction Projects
title_short Critical Factors and Mitigating Measures of Construction Delays of Pakistani Building Construction Projects
title_full Critical Factors and Mitigating Measures of Construction Delays of Pakistani Building Construction Projects
title_fullStr Critical Factors and Mitigating Measures of Construction Delays of Pakistani Building Construction Projects
title_full_unstemmed Critical Factors and Mitigating Measures of Construction Delays of Pakistani Building Construction Projects
title_sort critical factors and mitigating measures of construction delays of pakistani building construction projects
publisher uthm
publishDate 2023
url http://eprints.uthm.edu.my/9525/1/J16031_967153c8453a3abe1e8fa22bd83b29f9.pdf
http://eprints.uthm.edu.my/9525/
https://doi.org/10,30880/ij
_version_ 1773545912655675392
score 13.211869