Analysis building maintenance factors for IBS precast concrete system: a review

Since 1960’s, Malaysia construction industry had getting utilized Industrialized Building System(IBS) in some of the project. The most two earlier building which using IBS was Pekeliling Flat in Kuala Lumpur and Rifle Range Flat in Penang. Consequently, following the year after 1960’s th...

Full description

Saved in:
Bibliographic Details
Main Authors: Ng, Ban Kiong, Akasah, Zainal Abidin
Format: Article
Language:English
Published: 2012
Subjects:
Online Access:http://eprints.uthm.edu.my/8004/1/www.ijera.com.pdf
http://eprints.uthm.edu.my/8004/
Tags: Add Tag
No Tags, Be the first to tag this record!