Integrated influential factors of internal stakeholder that negatively affecting project successful completion in Yemen
Development construction projects in Yemen are encountering a huge delays in time, cost invade, surrendered and disappointment. Because of an emotional movement in the limit and volume of the Yemeni development part in the course of the most recent decade, the need of a deliberate investigation of t...
Saved in:
Main Authors: | , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Medwell Journals
2018
|
Subjects: | |
Online Access: | http://eprints.uthm.edu.my/5480/1/AJ%202018%20%28542%29.pdf http://eprints.uthm.edu.my/5480/ http://dx.doi.org/10.3923/sscience.2018.452.465 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.uthm.eprints.5480 |
---|---|
record_format |
eprints |
spelling |
my.uthm.eprints.54802022-01-09T08:09:39Z http://eprints.uthm.edu.my/5480/ Integrated influential factors of internal stakeholder that negatively affecting project successful completion in Yemen AL-Fadhali,, Najib Ng, Kim-Soon Zainal, Rozlin Ahmad, Abd Rahman Ali Hasaballah, Abdel Hafiez TH845-895 Architectural engineering. Structural engineering of buildings Development construction projects in Yemen are encountering a huge delays in time, cost invade, surrendered and disappointment. Because of an emotional movement in the limit and volume of the Yemeni development part in the course of the most recent decade, the need of a deliberate investigation of the reasons that adversely influencing negatively the project successful completion and building up an unmistakable comprehension among the stakeholder experts is profoundly urgent. The fundamental objective of this study is to recognize and rank the causes that contrarily influencing the project successful completion in Yemen. Utilizing a chose set of 55 qualities, this exploration initially distinguished the key elements affecting project completion in Yemen development industry. A survey has framed the premise of this examination and dispersed to proprietor, advisor and temporary worker. The outcome covers that the 10 major delay factors including money cash flow and financial difficulties faced by contractors, conflict between owners and other parties, delay in progress payment by owner, poor project management, slow decision from owner, escalation of prices of materials, lack of contractor experience, design errors made by designers, shortages of materials and poor site management and supervision. These findings are expected to be significant contributions to Yemen construction industry in controlling the time and cost overruns in construction. The effect of (IIF) is negatively influences to project successful completion regarding to time overrun, cost overrun, negatively affect to satisfaction of the stakeholder, negatively affect to technical specification and negatively affecting to fulfillment all meeting all the project objectives/requirements. These findings are required to be noteworthy commitments to Yemen development industry in controlling the time and cost invades in development. Medwell Journals 2018 Article PeerReviewed text en http://eprints.uthm.edu.my/5480/1/AJ%202018%20%28542%29.pdf AL-Fadhali,, Najib and Ng, Kim-Soon and Zainal, Rozlin and Ahmad, Abd Rahman and Ali Hasaballah, Abdel Hafiez (2018) Integrated influential factors of internal stakeholder that negatively affecting project successful completion in Yemen. Social Sciences, 13 (3). pp. 452-465. ISSN 1818-5800 http://dx.doi.org/10.3923/sscience.2018.452.465 |
institution |
Universiti Tun Hussein Onn Malaysia |
building |
UTHM Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Tun Hussein Onn Malaysia |
content_source |
UTHM Institutional Repository |
url_provider |
http://eprints.uthm.edu.my/ |
language |
English |
topic |
TH845-895 Architectural engineering. Structural engineering of buildings |
spellingShingle |
TH845-895 Architectural engineering. Structural engineering of buildings AL-Fadhali,, Najib Ng, Kim-Soon Zainal, Rozlin Ahmad, Abd Rahman Ali Hasaballah, Abdel Hafiez Integrated influential factors of internal stakeholder that negatively affecting project successful completion in Yemen |
description |
Development construction projects in Yemen are encountering a huge delays in time, cost invade, surrendered and disappointment. Because of an emotional movement in the limit and volume of the Yemeni development part in the course of the most recent decade, the need of a deliberate investigation of the reasons that adversely influencing negatively the project successful completion and building up an unmistakable comprehension among the stakeholder experts is profoundly urgent. The fundamental objective of this study is to recognize and rank the causes that contrarily influencing the project successful completion in Yemen. Utilizing a chose set of 55 qualities, this exploration initially distinguished the key elements affecting project completion in Yemen development industry. A survey has framed the premise of this examination and dispersed to proprietor, advisor and temporary worker. The outcome covers that the 10 major delay factors including money cash flow and financial difficulties faced by contractors, conflict between owners and other parties, delay in progress payment by owner, poor project management, slow decision from owner, escalation of prices of materials, lack of contractor experience, design errors made by designers, shortages of materials and poor site management and supervision. These findings are expected to be significant contributions to Yemen construction industry in controlling the time and cost overruns in construction. The effect of (IIF) is negatively influences to project successful completion regarding to time overrun, cost overrun, negatively affect to satisfaction of the stakeholder, negatively affect to technical specification and negatively affecting to fulfillment all meeting all the project objectives/requirements. These findings are required to be noteworthy commitments to Yemen development industry in controlling the time and cost invades in development. |
format |
Article |
author |
AL-Fadhali,, Najib Ng, Kim-Soon Zainal, Rozlin Ahmad, Abd Rahman Ali Hasaballah, Abdel Hafiez |
author_facet |
AL-Fadhali,, Najib Ng, Kim-Soon Zainal, Rozlin Ahmad, Abd Rahman Ali Hasaballah, Abdel Hafiez |
author_sort |
AL-Fadhali,, Najib |
title |
Integrated influential factors of internal stakeholder that negatively affecting project successful completion in Yemen |
title_short |
Integrated influential factors of internal stakeholder that negatively affecting project successful completion in Yemen |
title_full |
Integrated influential factors of internal stakeholder that negatively affecting project successful completion in Yemen |
title_fullStr |
Integrated influential factors of internal stakeholder that negatively affecting project successful completion in Yemen |
title_full_unstemmed |
Integrated influential factors of internal stakeholder that negatively affecting project successful completion in Yemen |
title_sort |
integrated influential factors of internal stakeholder that negatively affecting project successful completion in yemen |
publisher |
Medwell Journals |
publishDate |
2018 |
url |
http://eprints.uthm.edu.my/5480/1/AJ%202018%20%28542%29.pdf http://eprints.uthm.edu.my/5480/ http://dx.doi.org/10.3923/sscience.2018.452.465 |
_version_ |
1738581382876102656 |
score |
13.211869 |