Survey on Kuala Lumpur to Singapore High-Speed Rail (KL-SG HSR) Project among Pagoh Residents
The Kuala Lumpur to Singapore high-speed rail (KL-SG HSR) project is the first HSR that will be built in Malaysia. This project aim is to facilitate the journey between Malaysia and Singapore. The total length of the KL-SG HSR project is 350 kilometers, it covers 335 kilometers in Malaysia and 15 ki...
Saved in:
Main Authors: | , |
---|---|
Format: | Conference or Workshop Item |
Language: | English |
Published: |
2021
|
Subjects: | |
Online Access: | http://eprints.uthm.edu.my/2632/1/P12658_2c1f57e592a8f7126bc8ea0ccb0644f0.pdf http://eprints.uthm.edu.my/2632/ https://doi.org/10.1063/5.0053355 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|