Critical point study in the Sabah power grid for cascading failure blackouts
Sabah System Grid is made up of 66kV, 132kV and 275kV which link up all major towns in Sabah and Federal Territory of Labuan. As the Grid Owner, SESB is responsible for the development, management and operation of the Sabah System Grid. All activities pertaining to the System Grid are bounded...
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Language: | English English |
Published: |
2014
|
Subjects: | |
Online Access: | http://eprints.uthm.edu.my/1435/1/24p%20ALEXSTEIR%20MORIS.pdf http://eprints.uthm.edu.my/1435/2/ALEXSTEIR%20MORIS%20WATERMARK.pdf http://eprints.uthm.edu.my/1435/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|