Developing risk management framework for wellhead and christmas tree equipment
Poor design may cause product failure, can be affected the manufacturing processes such as delay in delivery time, increased cost, poor quality, lose time, and risk for lost time injury (LTI). To remain competitive in global marketplace the manufacturing wellhead and christmas tree equipment comp...
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Language: | English English English |
Published: |
2019
|
Subjects: | |
Online Access: | http://eprints.uthm.edu.my/11/1/24p%20ABDUL%20HAMID.pdf http://eprints.uthm.edu.my/11/2/ABDUL%20HAMID%20COPYRIGHT%20DECLARATION.pdf http://eprints.uthm.edu.my/11/3/ABDUL%20HAMID%20WATERMARK.pdf http://eprints.uthm.edu.my/11/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|