Work Study Architecture for Lean Waste Analysis to Achieve Optimum Man-Machine Configuration
To survive in the global marketplace, companies has adopted lean towards reducing wastes and improving their efficiency. Manpower study traditionally employs work study methods such as Process Mapping and Man-Machine Charts which are no longer suitable to be used in the complicated manufacturing env...
Saved in:
Main Authors: | Abdullah, Rohana, Abd Rahman, Md Nizam |
---|---|
Format: | Article |
Language: | English |
Published: |
International Journals of Engineering & Sciences
2014
|
Subjects: | |
Online Access: | http://eprints.utem.edu.my/id/eprint/12429/1/143301-9292-IJBAS-IJENS.pdf http://eprints.utem.edu.my/id/eprint/12429/ http://ijens.org/ijbas.html |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Human System Modeling for Optimum Labor Utilization and Man-Machine Configuration
by: Abdullah, Rohana, et al.
Published: (2014) -
An Integrated Architecture for Lean Waste Analysis
by: Abdullah, Rohana, et al.
Published: (2012) -
Leanness Achievement through People Development System in Implementing Lean Process Management
by: A. P., Puvanasvaran, et al.
Published: (2009) -
Achieving rapid construction using lean principles
by: Yahya, Muhammad Azani, et al.
Published: (2009) -
Human System Modelling For Labour Utilisation And Man-Machine Configuration At Cellular Manufacturing
by: Abdullah, Rohana
Published: (2017)