Development Of Unsignalised Intersection Analysis Procedure For The Malaysian Highway Capacity Manual [TE176. E73 2007 f rb].
Tesis ini membincangkan pembangunan prosedur analisis persimpangan keutamaan untuk Manual Kapasiti Lebuh Raya Malaysia (MHCM 2006). This thesis discusses the development of unsignalised intersection analysis procedure for the Malaysian Highway Capacity Manual (MHCM 2006).
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2007
|
Subjects: | |
Online Access: | http://eprints.usm.my/8929/1/DEVELOPMENT_OF_UNSIGNALISED_INTERSECTION_ANALYSIS_PROCEDURE_FOR_THE_MALAYSIAN_HIGHWAY_CAPACITY_MANUAL.pdf http://eprints.usm.my/8929/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.usm.eprints.8929 |
---|---|
record_format |
eprints |
spelling |
my.usm.eprints.8929 http://eprints.usm.my/8929/ Development Of Unsignalised Intersection Analysis Procedure For The Malaysian Highway Capacity Manual [TE176. E73 2007 f rb]. Sanik, Mohd Erwan TE175-176.5 Highway design. Interchanges and intersections Tesis ini membincangkan pembangunan prosedur analisis persimpangan keutamaan untuk Manual Kapasiti Lebuh Raya Malaysia (MHCM 2006). This thesis discusses the development of unsignalised intersection analysis procedure for the Malaysian Highway Capacity Manual (MHCM 2006). 2007-02 Thesis NonPeerReviewed application/pdf en http://eprints.usm.my/8929/1/DEVELOPMENT_OF_UNSIGNALISED_INTERSECTION_ANALYSIS_PROCEDURE_FOR_THE_MALAYSIAN_HIGHWAY_CAPACITY_MANUAL.pdf Sanik, Mohd Erwan (2007) Development Of Unsignalised Intersection Analysis Procedure For The Malaysian Highway Capacity Manual [TE176. E73 2007 f rb]. Masters thesis, Universiti Sains Malaysia. |
institution |
Universiti Sains Malaysia |
building |
Hamzah Sendut Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Sains Malaysia |
content_source |
USM Institutional Repository |
url_provider |
http://eprints.usm.my/ |
language |
English |
topic |
TE175-176.5 Highway design. Interchanges and intersections |
spellingShingle |
TE175-176.5 Highway design. Interchanges and intersections Sanik, Mohd Erwan Development Of Unsignalised Intersection Analysis Procedure For The Malaysian Highway Capacity Manual [TE176. E73 2007 f rb]. |
description |
Tesis ini membincangkan pembangunan prosedur analisis persimpangan keutamaan untuk Manual Kapasiti Lebuh Raya Malaysia (MHCM 2006).
This thesis discusses the development of unsignalised intersection analysis procedure for the Malaysian Highway Capacity Manual (MHCM 2006).
|
format |
Thesis |
author |
Sanik, Mohd Erwan |
author_facet |
Sanik, Mohd Erwan |
author_sort |
Sanik, Mohd Erwan |
title |
Development Of Unsignalised Intersection Analysis Procedure For The Malaysian Highway Capacity Manual
[TE176. E73 2007 f rb]. |
title_short |
Development Of Unsignalised Intersection Analysis Procedure For The Malaysian Highway Capacity Manual
[TE176. E73 2007 f rb]. |
title_full |
Development Of Unsignalised Intersection Analysis Procedure For The Malaysian Highway Capacity Manual
[TE176. E73 2007 f rb]. |
title_fullStr |
Development Of Unsignalised Intersection Analysis Procedure For The Malaysian Highway Capacity Manual
[TE176. E73 2007 f rb]. |
title_full_unstemmed |
Development Of Unsignalised Intersection Analysis Procedure For The Malaysian Highway Capacity Manual
[TE176. E73 2007 f rb]. |
title_sort |
development of unsignalised intersection analysis procedure for the malaysian highway capacity manual
[te176. e73 2007 f rb]. |
publishDate |
2007 |
url |
http://eprints.usm.my/8929/1/DEVELOPMENT_OF_UNSIGNALISED_INTERSECTION_ANALYSIS_PROCEDURE_FOR_THE_MALAYSIAN_HIGHWAY_CAPACITY_MANUAL.pdf http://eprints.usm.my/8929/ |
_version_ |
1643701125323423744 |
score |
13.211869 |