Technical & Financial Analysis Of Biomass Cogeneration Power Plant
This report presents the technical and financial analysis of biomass cogeneration power plant. The term ‘biomass’ means any organic matter that is available on a renewable or recurring basis. Cogeneration means simultaneous generation of two different forms of useful energy using one single pr...
Saved in:
Main Author: | |
---|---|
Format: | Monograph |
Language: | English |
Published: |
Universiti Sains Malaysia
2005
|
Subjects: | |
Online Access: | http://eprints.usm.my/58086/1/Technical%20%26%20Financial%20Analysis%20Of%20Biomass%20Cogeneration%20Power%20Plant_Ramesh%20Yanki%20Naidu.pdf http://eprints.usm.my/58086/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.usm.eprints.58086 |
---|---|
record_format |
eprints |
spelling |
my.usm.eprints.58086 http://eprints.usm.my/58086/ Technical & Financial Analysis Of Biomass Cogeneration Power Plant Yanki Naidu, Ramesh T Technology TJ Mechanical engineering and machinery This report presents the technical and financial analysis of biomass cogeneration power plant. The term ‘biomass’ means any organic matter that is available on a renewable or recurring basis. Cogeneration means simultaneous generation of two different forms of useful energy using one single primary source. Technical and financial analysis (TFA) will be done using TFA model, version 2 from COGEN 3 software. This analysis was done on two different power plants. They are Sungei Dingin Palm Oil Mill (2 MWe plant), which implemented by the Kumpulan Guthrie Berhad, located in Kulim, Kedah and Rice Husk Fired Cogeneration Plant situated in Thailand. During the comparison on the different power plants been carried out, the analysis on technical and financial must take into account. The comparison between power plant using fresh fruit bunch and rice husk with the baseline or power plant using current energy supply also been carried out. TFA model is a pre-evaluation of cogeneration projects. It can calculate the financial performance of a cogeneration project compared to electricity purchase and thermal energy (steam/hot water) generation in boiler to the host facility. Universiti Sains Malaysia 2005-03-04 Monograph NonPeerReviewed application/pdf en http://eprints.usm.my/58086/1/Technical%20%26%20Financial%20Analysis%20Of%20Biomass%20Cogeneration%20Power%20Plant_Ramesh%20Yanki%20Naidu.pdf Yanki Naidu, Ramesh (2005) Technical & Financial Analysis Of Biomass Cogeneration Power Plant. Project Report. Universiti Sains Malaysia, Pusat Pengajian Kejuruteraan Mekanikal. (Submitted) |
institution |
Universiti Sains Malaysia |
building |
Hamzah Sendut Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Sains Malaysia |
content_source |
USM Institutional Repository |
url_provider |
http://eprints.usm.my/ |
language |
English |
topic |
T Technology TJ Mechanical engineering and machinery |
spellingShingle |
T Technology TJ Mechanical engineering and machinery Yanki Naidu, Ramesh Technical & Financial Analysis Of Biomass Cogeneration Power Plant |
description |
This report presents the technical and financial analysis of biomass cogeneration
power plant. The term ‘biomass’ means any organic matter that is available on a
renewable or recurring basis. Cogeneration means simultaneous generation of two
different forms of useful energy using one single primary source. Technical and financial
analysis (TFA) will be done using TFA model, version 2 from COGEN 3 software.
This analysis was done on two different power plants. They are Sungei Dingin
Palm Oil Mill (2 MWe plant), which implemented by the Kumpulan Guthrie Berhad,
located in Kulim, Kedah and Rice Husk Fired Cogeneration Plant situated in Thailand.
During the comparison on the different power plants been carried out, the analysis on
technical and financial must take into account. The comparison between power plant
using fresh fruit bunch and rice husk with the baseline or power plant using current
energy supply also been carried out.
TFA model is a pre-evaluation of cogeneration projects. It can calculate the
financial performance of a cogeneration project compared to electricity purchase and
thermal energy (steam/hot water) generation in boiler to the host facility. |
format |
Monograph |
author |
Yanki Naidu, Ramesh |
author_facet |
Yanki Naidu, Ramesh |
author_sort |
Yanki Naidu, Ramesh |
title |
Technical & Financial Analysis Of Biomass Cogeneration Power Plant |
title_short |
Technical & Financial Analysis Of Biomass Cogeneration Power Plant |
title_full |
Technical & Financial Analysis Of Biomass Cogeneration Power Plant |
title_fullStr |
Technical & Financial Analysis Of Biomass Cogeneration Power Plant |
title_full_unstemmed |
Technical & Financial Analysis Of Biomass Cogeneration Power Plant |
title_sort |
technical & financial analysis of biomass cogeneration power plant |
publisher |
Universiti Sains Malaysia |
publishDate |
2005 |
url |
http://eprints.usm.my/58086/1/Technical%20%26%20Financial%20Analysis%20Of%20Biomass%20Cogeneration%20Power%20Plant_Ramesh%20Yanki%20Naidu.pdf http://eprints.usm.my/58086/ |
_version_ |
1765297644520865792 |
score |
13.211869 |