EAG444 – Soil Stabilisation and Ground Improvement Duration : 1 hour
Saved in:
Main Author: | |
---|---|
Format: | Teaching Resource |
Language: | English |
Published: |
Universiti Sains Malaysia
2021
|
Subjects: | |
Online Access: | http://eprints.usm.my/53894/1/13.%20EAG444%20FINAL%20EXAM.pdf http://eprints.usm.my/53894/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.usm.eprints.53894 |
---|---|
record_format |
eprints |
spelling |
my.usm.eprints.53894 http://eprints.usm.my/53894/ EAG444 – Soil Stabilisation and Ground Improvement Duration : 1 hour Awam, Pusat Pengajian Kejuruteraan T Technology TA Engineering (General). Civil engineering (General) Universiti Sains Malaysia 2021-02-01 Teaching Resource NonPeerReviewed application/pdf en http://eprints.usm.my/53894/1/13.%20EAG444%20FINAL%20EXAM.pdf Awam, Pusat Pengajian Kejuruteraan (2021) EAG444 – Soil Stabilisation and Ground Improvement Duration : 1 hour. [Teaching Resource] (Submitted) |
institution |
Universiti Sains Malaysia |
building |
Hamzah Sendut Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Sains Malaysia |
content_source |
USM Institutional Repository |
url_provider |
http://eprints.usm.my/ |
language |
English |
topic |
T Technology TA Engineering (General). Civil engineering (General) |
spellingShingle |
T Technology TA Engineering (General). Civil engineering (General) Awam, Pusat Pengajian Kejuruteraan EAG444 – Soil Stabilisation and Ground Improvement Duration : 1 hour |
format |
Teaching Resource |
author |
Awam, Pusat Pengajian Kejuruteraan |
author_facet |
Awam, Pusat Pengajian Kejuruteraan |
author_sort |
Awam, Pusat Pengajian Kejuruteraan |
title |
EAG444 – Soil Stabilisation and Ground Improvement
Duration : 1 hour |
title_short |
EAG444 – Soil Stabilisation and Ground Improvement
Duration : 1 hour |
title_full |
EAG444 – Soil Stabilisation and Ground Improvement
Duration : 1 hour |
title_fullStr |
EAG444 – Soil Stabilisation and Ground Improvement
Duration : 1 hour |
title_full_unstemmed |
EAG444 – Soil Stabilisation and Ground Improvement
Duration : 1 hour |
title_sort |
eag444 – soil stabilisation and ground improvement
duration : 1 hour |
publisher |
Universiti Sains Malaysia |
publishDate |
2021 |
url |
http://eprints.usm.my/53894/1/13.%20EAG444%20FINAL%20EXAM.pdf http://eprints.usm.my/53894/ |
_version_ |
1740826591522455552 |
score |
13.211869 |