Scheduling Large Project Into Work Packages
Penskedulan projek adalah salah satu daripada tiga peringkat utama di dalam sesuatu kitaran pengurusan projek. Ia merangkumi penentuan masa mula dan masa tamat· bagi setiap aktiviti di dalam sesuatu projek. Satu kaj ian dan pengelasan terperinci terhadap literatur penskedulan projek dihuraikan...
Saved in:
Main Author: | Mohamad Nor, Norazman |
---|---|
Format: | Thesis |
Language: | English |
Published: |
1994
|
Subjects: | |
Online Access: | http://eprints.usm.my/30912/1/NORAZMAN_BIN_MOHAMAD_NOR.pdf http://eprints.usm.my/30912/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
A New Selection Procedure For Large Scale Problems
by: Almomani, Mohammad Hani
Published: (2012) -
Some investigations on the LDA when handling large number of variable
by: Hamid, Hashibah, et al.
Published: (2010) -
The Use of Output Combiners in Enhancing the Performance of Large Data for ANNs
by: Mumtazimah, Mohamad, et al.
Published: (2014) -
Interactive design for Unimas bus schedule
by: Lee, Chiaw Mon
Published: (2013) -
Classification for large number of variables with two imbalanced groups
by: Ahmad Hakiim, Jamaluddin
Published: (2020)