Optimal Maintenance Scheduling for Multi-Component E-Manufacturing System

During the recent years, development of information technology caused to develop a new industrial system which is called e-Manufacturing system. Thanks to the webenabled manufacturing technologies, the lead times are being minimized to their extreme level, and the minimum amount of inventory is k...

Full description

Saved in:
Bibliographic Details
Main Author: Arab, Ali
Format: Thesis
Language:English
English
Published: 2009
Online Access:http://psasir.upm.edu.my/id/eprint/7334/1/FK_2009_18a.pdf
http://psasir.upm.edu.my/id/eprint/7334/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.upm.eprints.7334
record_format eprints
spelling my.upm.eprints.73342013-05-27T07:34:44Z http://psasir.upm.edu.my/id/eprint/7334/ Optimal Maintenance Scheduling for Multi-Component E-Manufacturing System Arab, Ali During the recent years, development of information technology caused to develop a new industrial system which is called e-Manufacturing system. Thanks to the webenabled manufacturing technologies, the lead times are being minimized to their extreme level, and the minimum amount of inventory is kept, though the products are being made-to order. Under these circumstances, achieving near-zero downtime of the plant floor’s equipments is a crucial factor which mitigates the risk of facing unmet demands. Many researches carried out to schedule maintenance actions in short term, but none of them have utilized all of planning horizon to spread maintenance actions along available time. In this research a method of enhanced maintenance scheduling of multi-component e-Manufacturing systems has been developed. In this multi-component system, importance of all machines is considered and the benefit of the entire system in term of produced parts is taken into account (versus benefits of single machine). In proposed system, the predicted machines degradation information, online information about work in process (WIP) inventory (at inventory buffer of each work station) as well as production line’s dynamism are taken into account. All of makespans of planning horizon have been utilized to improve scheduling efficiency and operational productivity by maximizing the system throughputs. A state-of-the-art method which is called simulation optimization has been utilized to implement the proposed scheduling method. The production system is simulated by ProModel software. It plays the role of objective function of the maintenance scheduling optimization problem. Using a production related heuristic method which is called system value method, the value of each workstation is determined. These values are used to define the objective function’s parameters. Then, using genetic algorithm-based software which is called SimRunner and has been embedded by ProModel, the scheduling optimization procedure is run to find optimum maintenance schedule. This process is carried out for nine generated scenarios. At the end, the results are benchmarked by two commonly used maintenance scheduling methods to magnify the importance of proposed intelligent maintenance scheduling in the multi-component e-Manufacturing systems. The results demonstrate that the proposed optimal maintenance scheduling method yields much better system value rather than sequencing methods. Furthermore, it indicates that when the mean time to repairs are longer, this method is more efficient. The results in the simulated testbed indicate that the developed scheduling method using simulation optimization functions properly and can be applied in other cases. 2009-09 Thesis NonPeerReviewed application/pdf en http://psasir.upm.edu.my/id/eprint/7334/1/FK_2009_18a.pdf Arab, Ali (2009) Optimal Maintenance Scheduling for Multi-Component E-Manufacturing System. Masters thesis, Universiti Putra Malaysia. English
institution Universiti Putra Malaysia
building UPM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Putra Malaysia
content_source UPM Institutional Repository
url_provider http://psasir.upm.edu.my/
language English
English
description During the recent years, development of information technology caused to develop a new industrial system which is called e-Manufacturing system. Thanks to the webenabled manufacturing technologies, the lead times are being minimized to their extreme level, and the minimum amount of inventory is kept, though the products are being made-to order. Under these circumstances, achieving near-zero downtime of the plant floor’s equipments is a crucial factor which mitigates the risk of facing unmet demands. Many researches carried out to schedule maintenance actions in short term, but none of them have utilized all of planning horizon to spread maintenance actions along available time. In this research a method of enhanced maintenance scheduling of multi-component e-Manufacturing systems has been developed. In this multi-component system, importance of all machines is considered and the benefit of the entire system in term of produced parts is taken into account (versus benefits of single machine). In proposed system, the predicted machines degradation information, online information about work in process (WIP) inventory (at inventory buffer of each work station) as well as production line’s dynamism are taken into account. All of makespans of planning horizon have been utilized to improve scheduling efficiency and operational productivity by maximizing the system throughputs. A state-of-the-art method which is called simulation optimization has been utilized to implement the proposed scheduling method. The production system is simulated by ProModel software. It plays the role of objective function of the maintenance scheduling optimization problem. Using a production related heuristic method which is called system value method, the value of each workstation is determined. These values are used to define the objective function’s parameters. Then, using genetic algorithm-based software which is called SimRunner and has been embedded by ProModel, the scheduling optimization procedure is run to find optimum maintenance schedule. This process is carried out for nine generated scenarios. At the end, the results are benchmarked by two commonly used maintenance scheduling methods to magnify the importance of proposed intelligent maintenance scheduling in the multi-component e-Manufacturing systems. The results demonstrate that the proposed optimal maintenance scheduling method yields much better system value rather than sequencing methods. Furthermore, it indicates that when the mean time to repairs are longer, this method is more efficient. The results in the simulated testbed indicate that the developed scheduling method using simulation optimization functions properly and can be applied in other cases.
format Thesis
author Arab, Ali
spellingShingle Arab, Ali
Optimal Maintenance Scheduling for Multi-Component E-Manufacturing System
author_facet Arab, Ali
author_sort Arab, Ali
title Optimal Maintenance Scheduling for Multi-Component E-Manufacturing System
title_short Optimal Maintenance Scheduling for Multi-Component E-Manufacturing System
title_full Optimal Maintenance Scheduling for Multi-Component E-Manufacturing System
title_fullStr Optimal Maintenance Scheduling for Multi-Component E-Manufacturing System
title_full_unstemmed Optimal Maintenance Scheduling for Multi-Component E-Manufacturing System
title_sort optimal maintenance scheduling for multi-component e-manufacturing system
publishDate 2009
url http://psasir.upm.edu.my/id/eprint/7334/1/FK_2009_18a.pdf
http://psasir.upm.edu.my/id/eprint/7334/
_version_ 1643823692925370368
score 13.211869