Cost of water acquisition from forested watershed

Estimation of the cost of water acquisition from two watershed, namely Sungai Teranum catchment area and Sungai Sia catchment area in Raub, Pahang, from the overall cost of managing the watershed by the Pahang State Forestry Department was conducted. Field measurements of river flow velocity and cro...

全面介绍

Saved in:
书目详细资料
Main Authors: Zulkeflee, Zufarzaana, Mohamad Pauzi, Jinan, Yusoff, Mohd Kamil, Jamil, Nor Rohaizah
格式: Article
语言:English
出版: Elsevier 2015
在线阅读:http://psasir.upm.edu.my/id/eprint/47819/1/47819.pdf
http://psasir.upm.edu.my/id/eprint/47819/
http://www.sciencedirect.com/science/article/pii/S1878029615006544
标签: 添加标签
没有标签, 成为第一个标记此记录!
实物特征
总结:Estimation of the cost of water acquisition from two watershed, namely Sungai Teranum catchment area and Sungai Sia catchment area in Raub, Pahang, from the overall cost of managing the watershed by the Pahang State Forestry Department was conducted. Field measurements of river flow velocity and cross-sectional area of the rivers were conducted and the average flow rates (m3/s) were determined using the formula Q=VA. It is estimated that the cost of 1 m3 of water generated from the Sungai Teranum catchment with an average water yield of 13868498.29 m3/yr is RM 0.0019 and RM 0.00069 from the Sungai Sia catchment with an average water yield of 113345052.96 m3/yr.