A method of evaluating safety Of construction Of infrastructure.

A method of safety evaluation of roller compacted concrete dam during construction and operation phase wherein the RCC dam is constructible through a plurality of construction stages is provided, the method includes the steps of simulating a sequence of the plurality of construction stages, performi...

Full description

Saved in:
Bibliographic Details
Main Authors: Noorzaei, Jamaloddin, Jaafar, Mohd Saleh, Mohammad, Thamer Ahmad, Abdulrazeg, Aeid. A., Khanehzaei, Parviz
Format: Patent
Published: 2010
Online Access:http://psasir.upm.edu.my/id/eprint/32244/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.upm.eprints.32244
record_format eprints
spelling my.upm.eprints.322442014-11-04T00:43:16Z http://psasir.upm.edu.my/id/eprint/32244/ A method of evaluating safety Of construction Of infrastructure. Noorzaei, Jamaloddin Jaafar, Mohd Saleh Mohammad, Thamer Ahmad Abdulrazeg, Aeid. A. Khanehzaei, Parviz A method of safety evaluation of roller compacted concrete dam during construction and operation phase wherein the RCC dam is constructible through a plurality of construction stages is provided, the method includes the steps of simulating a sequence of the plurality of construction stages, performing thermal analysis of the plurality of construction stages, performing structural analysis on the plurality of construction stages, performing crack prediction of the plurality of construction stages and recommending a safe sequence of the plurality of construction stages in addition to assessing the response of RCC dam during lifetime. 2010-10-18 Patent NonPeerReviewed Jamaloddin Noorzaei (2010) A method of evaluating safety Of construction Of infrastructure. PI2010700075.
institution Universiti Putra Malaysia
building UPM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Putra Malaysia
content_source UPM Institutional Repository
url_provider http://psasir.upm.edu.my/
description A method of safety evaluation of roller compacted concrete dam during construction and operation phase wherein the RCC dam is constructible through a plurality of construction stages is provided, the method includes the steps of simulating a sequence of the plurality of construction stages, performing thermal analysis of the plurality of construction stages, performing structural analysis on the plurality of construction stages, performing crack prediction of the plurality of construction stages and recommending a safe sequence of the plurality of construction stages in addition to assessing the response of RCC dam during lifetime.
format Patent
author Noorzaei, Jamaloddin
Jaafar, Mohd Saleh
Mohammad, Thamer Ahmad
Abdulrazeg, Aeid. A.
Khanehzaei, Parviz
spellingShingle Noorzaei, Jamaloddin
Jaafar, Mohd Saleh
Mohammad, Thamer Ahmad
Abdulrazeg, Aeid. A.
Khanehzaei, Parviz
A method of evaluating safety Of construction Of infrastructure.
author_facet Noorzaei, Jamaloddin
Jaafar, Mohd Saleh
Mohammad, Thamer Ahmad
Abdulrazeg, Aeid. A.
Khanehzaei, Parviz
author_sort Noorzaei, Jamaloddin
title A method of evaluating safety Of construction Of infrastructure.
title_short A method of evaluating safety Of construction Of infrastructure.
title_full A method of evaluating safety Of construction Of infrastructure.
title_fullStr A method of evaluating safety Of construction Of infrastructure.
title_full_unstemmed A method of evaluating safety Of construction Of infrastructure.
title_sort method of evaluating safety of construction of infrastructure.
publishDate 2010
url http://psasir.upm.edu.my/id/eprint/32244/
_version_ 1643830551322296320
score 13.211869