Optimum Time-Cost Trade-Off Strategies on Critical Path Method for Project Management

Approach of Crashing Critical Activities (CCA) was originally developed along with the Critical Path Method (CPM) for planning and controlling large scale projects in the late 50s. The objective of crashing critical activities in CPM is to find which activities should be crashed with the use of addi...

Full description

Saved in:
Bibliographic Details
Main Author: Khalaf, Wakas S.
Format: Thesis
Language:English
English
Published: 2010
Online Access:http://psasir.upm.edu.my/id/eprint/19685/1/IPM_2010_6_F.pdf
http://psasir.upm.edu.my/id/eprint/19685/
Tags: Add Tag
No Tags, Be the first to tag this record!

Similar Items