Reinforced pavement above trench under urban traffic load: case study and finite element (FE) analysis
Every year, 2000 km length of trench is being excavated through an existing pavement in Iran for installing urban waste water pipelines. Many a times, these trenches are not filled back properly resulting in large permanent settlement in the pavement constructed above the trench. Geogrids have been...
Saved in:
Main Authors: | , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Academic Journals
2010
|
Online Access: | http://psasir.upm.edu.my/id/eprint/16480/1/16480.pdf http://psasir.upm.edu.my/id/eprint/16480/ http://www.academicjournals.org/journal/SRE/article-abstract/7926B7118744 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|