Re-defining the requirements engineering process improvement model
A specialized Requirements Capability Maturity Model (R-CMM) was created by a group of researchers from UK as an attempt to support the requirements engineering phase of software development. The validation performed to this model shows that it has some potentials to be a useful tool for both practi...
Saved in:
Main Authors: | , , |
---|---|
Other Authors: | |
Format: | Conference paper |
Published: |
2023
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.uniten.dspace-30760 |
---|---|
record_format |
dspace |
spelling |
my.uniten.dspace-307602023-12-29T15:52:44Z Re-defining the requirements engineering process improvement model Solemon B. Sahibuddin S. Ghani A.A.A. 24832320000 35422662000 55441496400 Model RE process improvement Requirements engineering (RE) Computer aided software engineering Computer software Coordinate measuring machines Engineering Engineering exhibitions Capability maturity models Process Improvement RE process improvement Requirements capability maturity models Requirements engineering process Software capability maturity models Software development Software engineering institutes Requirements engineering A specialized Requirements Capability Maturity Model (R-CMM) was created by a group of researchers from UK as an attempt to support the requirements engineering phase of software development. The validation performed to this model shows that it has some potentials to be a useful tool for both practitioners and researchers in the field of process improvement and requirements engineering. However, the RCMM focuses on the requirements engineering process defined within the retired Software Engineering Institute's (SEI's) Software Capability Maturity Model (SW-CMM) process improvement framework. To continue its relevance and usefulness, we re-define the whole R-CMM within the characteristics of the latest Capability Maturity Model for Integration (CMMI) for Development (CMMI-DEV) v1.2. This paper describes how the CMMI-DEV characteristics are used to re-define the R-CMM, and rationale for re-building the requirements engineering model based on the latest process improvement framework. Also, this paper explains how the redefined R-CMM adapts to the goals and practices set by the CMMI-DEV. � 2009 IEEE. Final 2023-12-29T07:52:44Z 2023-12-29T07:52:44Z 2009 Conference paper 10.1109/APSEC.2009.54 2-s2.0-76349095998 https://www.scopus.com/inward/record.uri?eid=2-s2.0-76349095998&doi=10.1109%2fAPSEC.2009.54&partnerID=40&md5=496fe9581801249549940db72bfb926a https://irepository.uniten.edu.my/handle/123456789/30760 5358533 87 92 Scopus |
institution |
Universiti Tenaga Nasional |
building |
UNITEN Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Tenaga Nasional |
content_source |
UNITEN Institutional Repository |
url_provider |
http://dspace.uniten.edu.my/ |
topic |
Model RE process improvement Requirements engineering (RE) Computer aided software engineering Computer software Coordinate measuring machines Engineering Engineering exhibitions Capability maturity models Process Improvement RE process improvement Requirements capability maturity models Requirements engineering process Software capability maturity models Software development Software engineering institutes Requirements engineering |
spellingShingle |
Model RE process improvement Requirements engineering (RE) Computer aided software engineering Computer software Coordinate measuring machines Engineering Engineering exhibitions Capability maturity models Process Improvement RE process improvement Requirements capability maturity models Requirements engineering process Software capability maturity models Software development Software engineering institutes Requirements engineering Solemon B. Sahibuddin S. Ghani A.A.A. Re-defining the requirements engineering process improvement model |
description |
A specialized Requirements Capability Maturity Model (R-CMM) was created by a group of researchers from UK as an attempt to support the requirements engineering phase of software development. The validation performed to this model shows that it has some potentials to be a useful tool for both practitioners and researchers in the field of process improvement and requirements engineering. However, the RCMM focuses on the requirements engineering process defined within the retired Software Engineering Institute's (SEI's) Software Capability Maturity Model (SW-CMM) process improvement framework. To continue its relevance and usefulness, we re-define the whole R-CMM within the characteristics of the latest Capability Maturity Model for Integration (CMMI) for Development (CMMI-DEV) v1.2. This paper describes how the CMMI-DEV characteristics are used to re-define the R-CMM, and rationale for re-building the requirements engineering model based on the latest process improvement framework. Also, this paper explains how the redefined R-CMM adapts to the goals and practices set by the CMMI-DEV. � 2009 IEEE. |
author2 |
24832320000 |
author_facet |
24832320000 Solemon B. Sahibuddin S. Ghani A.A.A. |
format |
Conference paper |
author |
Solemon B. Sahibuddin S. Ghani A.A.A. |
author_sort |
Solemon B. |
title |
Re-defining the requirements engineering process improvement model |
title_short |
Re-defining the requirements engineering process improvement model |
title_full |
Re-defining the requirements engineering process improvement model |
title_fullStr |
Re-defining the requirements engineering process improvement model |
title_full_unstemmed |
Re-defining the requirements engineering process improvement model |
title_sort |
re-defining the requirements engineering process improvement model |
publishDate |
2023 |
_version_ |
1806426338446278656 |
score |
13.222552 |