Reliability and availability study on substation automation system based on IEC 61850
The introduction of IEC61850 standards for substation automation requires the specification of the reliability and availability performance parameter. Presently, the methodology to calculate and verify the parameters is not readily available. This paper proposed a methodology to calculate the parame...
Saved in:
Main Authors: | Yunus B., Musa A., Ong H.S., Khalid A.R., Hashim H. |
---|---|
Other Authors: | 24448917500 |
Format: | Conference paper |
Published: |
2023
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
A review of electric vehicle charging management based on the communication between EV, RSU and CS
by: Mohammed D., et al.
Published: (2024) -
Analysis of PQ waveform for optimum data transmission over IEC 61850 communication standards
by: Yunus B., et al.
Published: (2023) -
Mathematical models for productivity and availability of automated lines
by: Usubamatov, Ryspek, Prof. Dr., et al.
Published: (2014) -
Mathematical models for the productivity rate of automated lines with different failure rates for stations and mechanisms
by: Usubamatov, Ryspek, et al.
Published: (2016) -
Reliability and Availability modelling of Uninterruptible Power Supply (UPS) systems using Monte-Carlo simulation
by: Rahmat, Mohd Khairil, et al.