Analysis and optimization of 275 kV transmission tower by using linear static analysis and P-delta analysis

The increasing global population was demanded for more consumption of electricity. In Malaysia, it was reported that 17,790 megawatts (MW) was consumed in October 2017 due to high demand. The peak reading recorded is 0.011% increase compared to demand on April 2016 (17,788 MW). Following this, more...

Full description

Saved in:
Bibliographic Details
Main Authors: Kamarudin S.A., Usman F., Omar R.C., Yatim M.Y.M.
Other Authors: 57205237033
Format: Article
Published: Science Publishing Corporation Inc 2023
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uniten.dspace-24089
record_format dspace
spelling my.uniten.dspace-240892023-05-29T14:55:17Z Analysis and optimization of 275 kV transmission tower by using linear static analysis and P-delta analysis Kamarudin S.A. Usman F. Omar R.C. Yatim M.Y.M. 57205237033 55812540000 35753735300 57205235508 The increasing global population was demanded for more consumption of electricity. In Malaysia, it was reported that 17,790 megawatts (MW) was consumed in October 2017 due to high demand. The peak reading recorded is 0.011% increase compared to demand on April 2016 (17,788 MW). Following this, more transmission tower lines need to be developed to generate more electricity. Land acquisition is the main issue for constructing the new transmission tower because it requires a large area to set it up. The idea of optimization on the existing transmission tower helps in reducing cost for constructing the new structure. The aim of this study is to develop an optimal design of the transmission tower. A 275 kV transmission tower model is used in this study for analyzing and optimizing by using linear static and p-delta analysis. This optimization method is done by reducing tower members as well as increasing size of member's element. A design calculation for modification and arrangement of the transmission tower members is referred to manual guidelines of EN1993-3-1 and ASCE 10-97. Two alternatives are being prepared to produce an optimal design and result shows that a reduction percentage in term of reduced number of bar members can be saved up to 34 %. � 2018 Authors. Final 2023-05-29T06:55:17Z 2023-05-29T06:55:17Z 2018 Article 10.14419/ijet.v7i4.35.23098 2-s2.0-85059228756 https://www.scopus.com/inward/record.uri?eid=2-s2.0-85059228756&doi=10.14419%2fijet.v7i4.35.23098&partnerID=40&md5=b029bf1339401144ce553a3eac59f274 https://irepository.uniten.edu.my/handle/123456789/24089 7 4 734 738 Science Publishing Corporation Inc Scopus
institution Universiti Tenaga Nasional
building UNITEN Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Tenaga Nasional
content_source UNITEN Institutional Repository
url_provider http://dspace.uniten.edu.my/
description The increasing global population was demanded for more consumption of electricity. In Malaysia, it was reported that 17,790 megawatts (MW) was consumed in October 2017 due to high demand. The peak reading recorded is 0.011% increase compared to demand on April 2016 (17,788 MW). Following this, more transmission tower lines need to be developed to generate more electricity. Land acquisition is the main issue for constructing the new transmission tower because it requires a large area to set it up. The idea of optimization on the existing transmission tower helps in reducing cost for constructing the new structure. The aim of this study is to develop an optimal design of the transmission tower. A 275 kV transmission tower model is used in this study for analyzing and optimizing by using linear static and p-delta analysis. This optimization method is done by reducing tower members as well as increasing size of member's element. A design calculation for modification and arrangement of the transmission tower members is referred to manual guidelines of EN1993-3-1 and ASCE 10-97. Two alternatives are being prepared to produce an optimal design and result shows that a reduction percentage in term of reduced number of bar members can be saved up to 34 %. � 2018 Authors.
author2 57205237033
author_facet 57205237033
Kamarudin S.A.
Usman F.
Omar R.C.
Yatim M.Y.M.
format Article
author Kamarudin S.A.
Usman F.
Omar R.C.
Yatim M.Y.M.
spellingShingle Kamarudin S.A.
Usman F.
Omar R.C.
Yatim M.Y.M.
Analysis and optimization of 275 kV transmission tower by using linear static analysis and P-delta analysis
author_sort Kamarudin S.A.
title Analysis and optimization of 275 kV transmission tower by using linear static analysis and P-delta analysis
title_short Analysis and optimization of 275 kV transmission tower by using linear static analysis and P-delta analysis
title_full Analysis and optimization of 275 kV transmission tower by using linear static analysis and P-delta analysis
title_fullStr Analysis and optimization of 275 kV transmission tower by using linear static analysis and P-delta analysis
title_full_unstemmed Analysis and optimization of 275 kV transmission tower by using linear static analysis and P-delta analysis
title_sort analysis and optimization of 275 kv transmission tower by using linear static analysis and p-delta analysis
publisher Science Publishing Corporation Inc
publishDate 2023
_version_ 1806426042587414528
score 13.222552