Effect of averaging period on wind resource assessment for wind turbine installation project at UNITEN

Assessing the wind resource available at a particular site is the initial step of determining the feasibility of a wind turbine installation project. Several methods are frequently used to assess wind resource at a particular site, such as using wind map, local site measurement and measure-correlate...

Full description

Saved in:
Bibliographic Details
Main Authors: Roslan E., Mohamed H., Chan L., Isa M.R.
Other Authors: 57189299886
Format: Conference Paper
Published: American Institute of Physics Inc. 2023
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uniten.dspace-23587
record_format dspace
spelling my.uniten.dspace-235872023-05-29T14:50:22Z Effect of averaging period on wind resource assessment for wind turbine installation project at UNITEN Roslan E. Mohamed H. Chan L. Isa M.R. 57189299886 57136356100 57139456500 57193957146 Assessing the wind resource available at a particular site is the initial step of determining the feasibility of a wind turbine installation project. Several methods are frequently used to assess wind resource at a particular site, such as using wind map, local site measurement and measure-correlate-predict. A certain degree of measurement at site is needed for the final two methods. Wind speed data is usually measured and collected at a certain frequency or sampling rate, based on the resolution of the measurement device used. This data is then averaged at a certain period, depending on the standards used or its application. This research investigates the effect of having different averaging period when processing the raw wind speed data on the estimated power and energy potential of a wind turbine installation project at Universiti Tenaga Nasional (UNITEN), Malaysia. Results have shown that different averaging periods 2-minute and 10-seconds have 27.15% and 54.3% difference respectively to hourly averaged data in terms of energy yield estimation. These differences can affect a feasibility study of a wind turbine project. � 2018 Author(s). Final 2023-05-29T06:50:22Z 2023-05-29T06:50:22Z 2018 Conference Paper 10.1063/1.5066898 2-s2.0-85057284643 https://www.scopus.com/inward/record.uri?eid=2-s2.0-85057284643&doi=10.1063%2f1.5066898&partnerID=40&md5=12b3da94c7f71d0aa86edc3be471d5e4 https://irepository.uniten.edu.my/handle/123456789/23587 2030 20257 American Institute of Physics Inc. Scopus
institution Universiti Tenaga Nasional
building UNITEN Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Tenaga Nasional
content_source UNITEN Institutional Repository
url_provider http://dspace.uniten.edu.my/
description Assessing the wind resource available at a particular site is the initial step of determining the feasibility of a wind turbine installation project. Several methods are frequently used to assess wind resource at a particular site, such as using wind map, local site measurement and measure-correlate-predict. A certain degree of measurement at site is needed for the final two methods. Wind speed data is usually measured and collected at a certain frequency or sampling rate, based on the resolution of the measurement device used. This data is then averaged at a certain period, depending on the standards used or its application. This research investigates the effect of having different averaging period when processing the raw wind speed data on the estimated power and energy potential of a wind turbine installation project at Universiti Tenaga Nasional (UNITEN), Malaysia. Results have shown that different averaging periods 2-minute and 10-seconds have 27.15% and 54.3% difference respectively to hourly averaged data in terms of energy yield estimation. These differences can affect a feasibility study of a wind turbine project. � 2018 Author(s).
author2 57189299886
author_facet 57189299886
Roslan E.
Mohamed H.
Chan L.
Isa M.R.
format Conference Paper
author Roslan E.
Mohamed H.
Chan L.
Isa M.R.
spellingShingle Roslan E.
Mohamed H.
Chan L.
Isa M.R.
Effect of averaging period on wind resource assessment for wind turbine installation project at UNITEN
author_sort Roslan E.
title Effect of averaging period on wind resource assessment for wind turbine installation project at UNITEN
title_short Effect of averaging period on wind resource assessment for wind turbine installation project at UNITEN
title_full Effect of averaging period on wind resource assessment for wind turbine installation project at UNITEN
title_fullStr Effect of averaging period on wind resource assessment for wind turbine installation project at UNITEN
title_full_unstemmed Effect of averaging period on wind resource assessment for wind turbine installation project at UNITEN
title_sort effect of averaging period on wind resource assessment for wind turbine installation project at uniten
publisher American Institute of Physics Inc.
publishDate 2023
_version_ 1806427784502837248
score 13.222552