Evaluation of Condition Assessment of Tunnel Lining using Inspection Manual of CIRIA and FHWA
Hydroelectric power; Hydroelectric power plants; Shotcreting; Variable speed transmissions; Condition assessments; Hydroelectric power station; Visual condition; Linings
Saved in:
Main Authors: | Usman F., Banuar N., Ismail M.N., Othman N.A. |
---|---|
Other Authors: | 55812540000 |
Format: | Conference Paper |
Published: |
Institute of Physics Publishing
2023
|
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Development of condition rating of shotcrete lining of hydroelectric power station based on condition assessment of its distresses
by: Usman F., et al.
Published: (2023) -
Risk analysis of hydroelectric power station considering identified risk factors based on condition distress rating
by: Usman F., et al.
Published: (2023) -
Assessment on tunnel lining to ensure stability in soft ground
by: Mohd. Muhtar, N. I. S., et al.
Published: (2019) -
Design and simulation of highway tunnel inspection mechanism
by: Muhammad Hafizuddin Bin Moktar
Published: (2023) -
Segmental tunnel lining design- understanding ground-Tunnel interactions in staggered tunnel lining
by: Siti Norafida, Jusoh, Dr.
Published: (2018)