Development of optimized maintenance scheduling model for coal-fired power plant boiler
Maintenance in power plants is crucial to extend the life and reducing the risk of sudden breakdown or outage of coal-fired power plant steam boilers. Traditionally, coal fired power plant boilers are scheduled for maintenance in periods to ensure that the demand of the system is fully met and the r...
Saved in:
主要作者: | |
---|---|
格式: | text::Thesis |
语言: | English |
出版: |
2023
|
主题: | |
标签: |
添加标签
没有标签, 成为第一个标记此记录!
|