Development of optimized maintenance scheduling model for coal-fired power plant boiler

Maintenance in power plants is crucial to extend the life and reducing the risk of sudden breakdown or outage of coal-fired power plant steam boilers. Traditionally, coal fired power plant boilers are scheduled for maintenance in periods to ensure that the demand of the system is fully met and the r...

全面介绍

Saved in:
书目详细资料
主要作者: Noor Fazreen Binti Ahmad Fuzi, Ms.
格式: text::Thesis
语言:English
出版: 2023
主题:
标签: 添加标签
没有标签, 成为第一个标记此记录!