Resetting the ground fault relay on a 28 MVA power transformer due to grounding method retrofit

. The goal of the retrofit at Zamrud substation is to transform a 28 MVA power transformer's neutral point grounding system from direct grounding to grounding using a 20 Ohm Neutral Grounding Resistor (NGR). The amount of short-circuit current produced will fluctuate with the installation of NG...

Full description

Saved in:
Bibliographic Details
Main Authors: Hamzah, Eteruddin, Arlenny, -, Hadiana, Siswanto, Yanuar Z., Arief, Fathimah, Hasanti
Format: Proceeding
Language:English
Published: IOP Publishing 2022
Online Access:http://ir.unimas.my/id/eprint/40381/1/Resetting%20the%20ground%20-%20Copy.pdf
http://ir.unimas.my/id/eprint/40381/
https://iopscience.iop.org/article/10.1088/1755-1315/1041/1/012021
Tags: Add Tag
No Tags, Be the first to tag this record!