Resetting the ground fault relay on a 28 MVA power transformer due to grounding method retrofit
. The goal of the retrofit at Zamrud substation is to transform a 28 MVA power transformer's neutral point grounding system from direct grounding to grounding using a 20 Ohm Neutral Grounding Resistor (NGR). The amount of short-circuit current produced will fluctuate with the installation of NG...
Saved in:
Main Authors: | , , , , |
---|---|
Format: | Proceeding |
Language: | English |
Published: |
IOP Publishing
2022
|
Online Access: | http://ir.unimas.my/id/eprint/40381/1/Resetting%20the%20ground%20-%20Copy.pdf http://ir.unimas.my/id/eprint/40381/ https://iopscience.iop.org/article/10.1088/1755-1315/1041/1/012021 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|