Real-Life Optimum Shift Scheduling Design
In many industries, manpower shift scheduling poses problems that require immediate solutions. The fundamental need in this domain is to ensure that all shifts are assigned to cover all or as many jobs as possible. The shifts should additionally be planned with minimum manpower utilization, minimum...
Saved in:
Main Authors: | Lee, Kong Weng, Sze, San Nah |
---|---|
Format: | E-Article |
Language: | English |
Published: |
ITB Journal Publisher
2019
|
Subjects: | |
Online Access: | http://ir.unimas.my/id/eprint/25764/1/Real-Life%20Optimum%20Shift%20Scheduling%20Design%20-%20Copy.pdf http://ir.unimas.my/id/eprint/25764/ http://journals.itb.ac.id/index.php/jictra/article/view/9108 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Heuristic method for optimum shift scheduling design
by: Lee, Kong Weng, et al.
Published: (2017) -
Real life working shift assignment problem
by: Sze, San Nah, et al.
Published: (2017) -
Rule Prioritisation Heuristic in Shift Design of Airline Ground Crew
by: Kong Weng, Lee
Published: (2024) -
Study on genetic algorithm and heuristic method for solving traveling salesman problem
by: Sze , San Nah
Published: (2004) -
Restaurant Employee Shift Scheduling System (R3S)
by: Ting, Seng Shiong
Published: (2023)