Potensi kitar semula dalam industri pembinaan: Kajian kes Daerah Batu Pahat, Johor

MUCEET 2009 is organized by Malaysian Technical Universities Network (MTUN) comprising of Universiti Malaysia Perlis (UniMAP), Universiti Tun Hussein Onn (UTHM), Universiti Teknikal Melaka (UTeM) and Universiti Malaysia Pahang (UMP), 20th - 22nd June 2009 at M. S. Garden Hotel, Kuantan, Pahang.

Saved in:
Bibliographic Details
Main Authors: Sharifah Meryam, Shareh Musa, Haryati, Shafii, Syarifah Nursyahadilla, Syed Muhammad Zubir
Format: Working Paper
Language:English
Published: Universiti Malaysia Pahang (UMP) 2010
Subjects:
Online Access:http://dspace.unimap.edu.my/xmlui/handle/123456789/8854
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.unimap-8854
record_format dspace
spelling my.unimap-88542010-08-19T05:44:10Z Potensi kitar semula dalam industri pembinaan: Kajian kes Daerah Batu Pahat, Johor Sharifah Meryam, Shareh Musa Haryati, Shafii Syarifah Nursyahadilla, Syed Muhammad Zubir Potensi Kitar semula Bahan binaan Tapak binaan Sektor pembinaan Malaysian Technical Universities Conference on Engineering and Technology (MUCEET) MUCEET 2009 is organized by Malaysian Technical Universities Network (MTUN) comprising of Universiti Malaysia Perlis (UniMAP), Universiti Tun Hussein Onn (UTHM), Universiti Teknikal Melaka (UTeM) and Universiti Malaysia Pahang (UMP), 20th - 22nd June 2009 at M. S. Garden Hotel, Kuantan, Pahang. Perkembangan pembangunan di Malaysia telah menggalakkan peningkatan penjanaan sisa bahan pembinaan. Isu lebihan bahan binaan di tapak bina dan pengurusannya yang lemah menyebabkan berlakunya pembaziran bahan yang boleh dikitar semula. Objektif kajian adalah untuk mengkaji sisa bahan binaan yang terhasil di tapak bina serta potensi kitar semula dan mengkaji tahap pemahaman kontraktor terhadap program kitar semula. Kajian ini memfokuskan hanya kepada kontraktor kelas A dan B sahaja di daerah Batu Pahat, Johor. Kajian dijalankan menggunakan kaedah soal selidik dan sejumlah 9 kontraktor telah dipilih sebanai sampel. Hasil kajian menunjukkan bahawa sisa kayu adalah bahan yang paling tinggi dijana dengan nilai min purata sebanyak 3.88, diikuti oleh penjanaan daripada logam besi dan bata dan tong cat adalah masingmasing pada purata min sebanyak 3.33 dan 3.22. Manakala penjanaan bahan fibre adalah paling rendah iaitu dengan nilai min 1.66. Jumlah peratusan bahan yang berpontensi untuk dikitar semula berdasarkan anggaran pihak kontraktor menunjukkan kuntiti penjanaan berada pada tahap ’sederhana’ dan ’banyak’. Hasil kajian terhadap potensi kitar semula menunjukkan majoriti responden faham tentang kitar semula dan bersetuju bahawa jumlah sisa binaan yang dikitar semula membantu mengurangkan sisa binaan di tapak bina. Justeru, dalam masa yang sama dapat mengurangkan masalah pencemaran alam sekitar di tapak pembinaan. 2010-08-19T05:44:10Z 2010-08-19T05:44:10Z 2009-06-20 Working Paper p.553-559 http://hdl.handle.net/123456789/8854 en Proceedings of the Malaysian Technical Universities Conference on Engineering and Technology (MUCEET) 2009 Universiti Malaysia Pahang (UMP)
institution Universiti Malaysia Perlis
building UniMAP Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaysia Perlis
content_source UniMAP Library Digital Repository
url_provider http://dspace.unimap.edu.my/
language English
topic Potensi
Kitar semula
Bahan binaan
Tapak binaan
Sektor pembinaan
Malaysian Technical Universities Conference on Engineering and Technology (MUCEET)
spellingShingle Potensi
Kitar semula
Bahan binaan
Tapak binaan
Sektor pembinaan
Malaysian Technical Universities Conference on Engineering and Technology (MUCEET)
Sharifah Meryam, Shareh Musa
Haryati, Shafii
Syarifah Nursyahadilla, Syed Muhammad Zubir
Potensi kitar semula dalam industri pembinaan: Kajian kes Daerah Batu Pahat, Johor
description MUCEET 2009 is organized by Malaysian Technical Universities Network (MTUN) comprising of Universiti Malaysia Perlis (UniMAP), Universiti Tun Hussein Onn (UTHM), Universiti Teknikal Melaka (UTeM) and Universiti Malaysia Pahang (UMP), 20th - 22nd June 2009 at M. S. Garden Hotel, Kuantan, Pahang.
format Working Paper
author Sharifah Meryam, Shareh Musa
Haryati, Shafii
Syarifah Nursyahadilla, Syed Muhammad Zubir
author_facet Sharifah Meryam, Shareh Musa
Haryati, Shafii
Syarifah Nursyahadilla, Syed Muhammad Zubir
author_sort Sharifah Meryam, Shareh Musa
title Potensi kitar semula dalam industri pembinaan: Kajian kes Daerah Batu Pahat, Johor
title_short Potensi kitar semula dalam industri pembinaan: Kajian kes Daerah Batu Pahat, Johor
title_full Potensi kitar semula dalam industri pembinaan: Kajian kes Daerah Batu Pahat, Johor
title_fullStr Potensi kitar semula dalam industri pembinaan: Kajian kes Daerah Batu Pahat, Johor
title_full_unstemmed Potensi kitar semula dalam industri pembinaan: Kajian kes Daerah Batu Pahat, Johor
title_sort potensi kitar semula dalam industri pembinaan: kajian kes daerah batu pahat, johor
publisher Universiti Malaysia Pahang (UMP)
publishDate 2010
url http://dspace.unimap.edu.my/xmlui/handle/123456789/8854
_version_ 1643789340055175168
score 13.211869