Delay in large MARA construction projects based on project management consultant perspective
MUCEET 2009 is organized by Malaysian Technical Universities Network (MTUN) comprising of Universiti Malaysia Perlis (UniMAP), Universiti Tun Hussein Onn (UTHM), Universiti Teknikal Melaka (UTeM) and Universiti Malaysia Pahang (UMP), 20th - 22nd June 2009 at M. S. Garden Hotel, Kuantan, Pahang.
Saved in:
Main Authors: | Mohd Razaki, Abdullah, Ismail, Abd Rahman, Adi Asmi, Abd Azis |
---|---|
其他作者: | abdullahrazaki@yahoo.com |
格式: | Working Paper |
语言: | English |
出版: |
Universiti Malaysia Pahang (UMP)
2010
|
主题: | |
在线阅读: | http://dspace.unimap.edu.my/xmlui/handle/123456789/8519 |
标签: |
添加标签
没有标签, 成为第一个标记此记录!
|
相似书籍
-
The effect of modified UNBabc mapping function on the improvement of Global Positioning System tropospheric delay
由: Hamzah, Sakidin, et al.
出版: (2010) -
Recurring Project Overrun and Project Management Problems in Engineering and Construction Industries
由: Lim, Cheong Seng
出版: (2001) -
Case study: Investigating factors contributed to failure of project delivery within stipulated contract time
由: Ahmad Harith Bin Ishak
出版: (2023) -
Lack of awareness among contractor in project management: delay construction / Suria Yaacob
由: Yaacob, Suria
出版: (2006) -
Large infrastructure projects - Potential overseas
由: Anon
出版: (2011)