Delay in large MARA construction projects based on project management consultant perspective

MUCEET 2009 is organized by Malaysian Technical Universities Network (MTUN) comprising of Universiti Malaysia Perlis (UniMAP), Universiti Tun Hussein Onn (UTHM), Universiti Teknikal Melaka (UTeM) and Universiti Malaysia Pahang (UMP), 20th - 22nd June 2009 at M. S. Garden Hotel, Kuantan, Pahang.

Saved in:
Bibliographic Details
Main Authors: Mohd Razaki, Abdullah, Ismail, Abd Rahman, Adi Asmi, Abd Azis
Other Authors: abdullahrazaki@yahoo.com
Format: Working Paper
Language:English
Published: Universiti Malaysia Pahang (UMP) 2010
Subjects:
Online Access:http://dspace.unimap.edu.my/xmlui/handle/123456789/8519
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.unimap-8519
record_format dspace
spelling my.unimap-85192010-08-10T10:05:52Z Delay in large MARA construction projects based on project management consultant perspective Mohd Razaki, Abdullah Ismail, Abd Rahman Adi Asmi, Abd Azis abdullahrazaki@yahoo.com MUCEET Malaysian Technical Universities Conference on Engineering and Technology Construction delay MARA construction project MUCEET 2009 is organized by Malaysian Technical Universities Network (MTUN) comprising of Universiti Malaysia Perlis (UniMAP), Universiti Tun Hussein Onn (UTHM), Universiti Teknikal Melaka (UTeM) and Universiti Malaysia Pahang (UMP), 20th - 22nd June 2009 at M. S. Garden Hotel, Kuantan, Pahang. The construction industry is a major catalyst to the growth of the nation’s socio economic development. The frequent delay of the large construction project has been a phenomenon and it effects the implementation of the strategic planning. This paper presents the findings of survey of dominant cause of delay in large MARA (Majlis Amanah Rakyat) construction project in the perspective of project management consultants (PMC). Respondents of this survey were personnel that work as PMC ranging from the executives, managerial and supporting groups. The result revealed that the five most significant delay causes as seen by PMC were cash flow and financial difficulties faced by contractors, contractor's poor site management, inadequate contractor experience, shortage of site workers and ineffective planning and scheduling by contractors. Hopefully, the findings of this study will at least shade some lights to the problems faced by MARA large construction project and effort can be taken to improve it. 2010-08-10T10:05:52Z 2010-08-10T10:05:52Z 2009-06-20 Working Paper p.9-13 http://hdl.handle.net/123456789/8519 en Proceedings of the Malaysian Technical Universities Conference on Engineering and Technology (MUCEET) 2009 Universiti Malaysia Pahang (UMP)
institution Universiti Malaysia Perlis
building UniMAP Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaysia Perlis
content_source UniMAP Library Digital Repository
url_provider http://dspace.unimap.edu.my/
language English
topic MUCEET
Malaysian Technical Universities Conference on Engineering and Technology
Construction delay
MARA construction project
spellingShingle MUCEET
Malaysian Technical Universities Conference on Engineering and Technology
Construction delay
MARA construction project
Mohd Razaki, Abdullah
Ismail, Abd Rahman
Adi Asmi, Abd Azis
Delay in large MARA construction projects based on project management consultant perspective
description MUCEET 2009 is organized by Malaysian Technical Universities Network (MTUN) comprising of Universiti Malaysia Perlis (UniMAP), Universiti Tun Hussein Onn (UTHM), Universiti Teknikal Melaka (UTeM) and Universiti Malaysia Pahang (UMP), 20th - 22nd June 2009 at M. S. Garden Hotel, Kuantan, Pahang.
author2 abdullahrazaki@yahoo.com
author_facet abdullahrazaki@yahoo.com
Mohd Razaki, Abdullah
Ismail, Abd Rahman
Adi Asmi, Abd Azis
format Working Paper
author Mohd Razaki, Abdullah
Ismail, Abd Rahman
Adi Asmi, Abd Azis
author_sort Mohd Razaki, Abdullah
title Delay in large MARA construction projects based on project management consultant perspective
title_short Delay in large MARA construction projects based on project management consultant perspective
title_full Delay in large MARA construction projects based on project management consultant perspective
title_fullStr Delay in large MARA construction projects based on project management consultant perspective
title_full_unstemmed Delay in large MARA construction projects based on project management consultant perspective
title_sort delay in large mara construction projects based on project management consultant perspective
publisher Universiti Malaysia Pahang (UMP)
publishDate 2010
url http://dspace.unimap.edu.my/xmlui/handle/123456789/8519
_version_ 1643789222935527424
score 13.222552