Delay in large MARA construction projects based on project management consultant perspective
MUCEET 2009 is organized by Malaysian Technical Universities Network (MTUN) comprising of Universiti Malaysia Perlis (UniMAP), Universiti Tun Hussein Onn (UTHM), Universiti Teknikal Melaka (UTeM) and Universiti Malaysia Pahang (UMP), 20th - 22nd June 2009 at M. S. Garden Hotel, Kuantan, Pahang.
保存先:
主要な著者: | Mohd Razaki, Abdullah, Ismail, Abd Rahman, Adi Asmi, Abd Azis |
---|---|
その他の著者: | abdullahrazaki@yahoo.com |
フォーマット: | Working Paper |
言語: | English |
出版事項: |
Universiti Malaysia Pahang (UMP)
2010
|
主題: | |
オンライン・アクセス: | http://dspace.unimap.edu.my/xmlui/handle/123456789/8519 |
タグ: |
タグ追加
タグなし, このレコードへの初めてのタグを付けませんか!
|
類似資料
-
The effect of modified UNBabc mapping function on the improvement of Global Positioning System tropospheric delay
著者:: Hamzah, Sakidin, 等
出版事項: (2010) -
Recurring Project Overrun and Project Management Problems in Engineering and Construction Industries
著者:: Lim, Cheong Seng
出版事項: (2001) -
Case study: Investigating factors contributed to failure of project delivery within stipulated contract time
著者:: Ahmad Harith Bin Ishak
出版事項: (2023) -
Lack of awareness among contractor in project management: delay construction / Suria Yaacob
著者:: Yaacob, Suria
出版事項: (2006) -
Large infrastructure projects - Potential overseas
著者:: Anon
出版事項: (2011)