Study on application of industrialized building system (IBS) in Perlis
Industrialized Building Systems (IBS) is also known as the complete assembly construction. This system where components are manufactured at factories on or off site, transported and then assembled into a structure with minimum work. The main objective of this study is to find the implementation leve...
Saved in:
Main Author: | Luqman, Walid |
---|---|
Other Authors: | Roshazita Che Amat |
Format: | Learning Object |
Language: | English |
Published: |
Universiti Malaysia Perlis (UniMAP)
2013
|
Subjects: | |
Online Access: | http://dspace.unimap.edu.my/xmlui/handle/123456789/23957 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Awareness of the Industrialized Building System (IBS) implementation in northern Malaysia - A case study in Perlis
by: Umar, Hj. Kassim, et al.
Published: (2013) -
Awareness of the Industrialized Building System (IBS) implementation in Northern Malaysia - A case study in Perlis
by: Umar, Hj. Kassim, et al.
Published: (2014) -
Introduction to the IBS Content Scoring System (IBS score) manual
by: Construction Industry Development Board (CIDB)
Published: (2011) -
IBS tech to drive affordable housing
by: Ahmad Fairuz, Othman
Published: (2020) -
Stability study of high rise IBS building using STAAD PRO
by: Engku Muhammad Afnan, Engku Azman
Published: (2015)